The Bureau of Reclamation, Phoenix Area Office (Reclamation), undertook the development of a Water Management Plan (WMP) as part of the Central Arizona Project (CAP). In consultation with the San Carlos Irrigation Project (SCIP), the Gila River Indian Community (GRIC), and the San Carlos Irrigation and Drainage District (SCIDD), it was proposed that the Joint Works would require rehabilitation or replacement to facilitate the WMP, specifically the delivery of water to the Pima-Maricopa...
A Class One Overview for the Proposed San Carlos Irrigation Project Joint Works Rehabilitation: Report (1995)
The Bureau of Reclamation, Phoenix Area Office (Reclamation), undertook the development of a Water Management Plan (WMP) as part of the Central Arizona Project (CAP). In consultation with the San Carlos Irrigation Project (SCIP), the Gila River Indian Community (GRIC), and the San Carlos Irrigation and Drainage District (SCIDD), it was proposed that the Joint Works would require rehabilitation or replacement to facilitate the WMP, specifically the delivery of water to the Pima-Maricopa...
Cultural Resources Assessment of 59 Archaeological Sites Located Along Reaches 1 and 2 of the Tucson Aqueduct (Phase A) (2010)
The Bureau of Reclamation has developed an archaeological site database for the Central Arizona Project (CAP) canal main stem based on the Class III survey data that includes all previously recorded sites. An unknown number of these sites were either destroyed by construction or excavation, while others are no longer located within the CAP right-of-way (ROW). To assist Reclamation in checking the accuracy of its site database, Archaeological Consulting Services, Ltd. (ACS) was asked to revisit...
Cultural Resources Assessment of 59 Archaeological Sites Located Along Reaches 1 and 2 of the Tucson Aqueduct (Phase A)
The Bureau of Reclamation has developed an archaeological site database for the CAP main stem based on the Class III survey data that includes all previously recorded sites. An unknown number of these sites were either destroyed by construction or excavation, while others are no longer located within the CAP right-of-way (ROW). To assist Reclamation in checking the accuracy of its site database, Archaeological Consulting Services, Ltd. (ACS) was asked to revisit 59 sites that had been identified...
Photolog for the Photos from the Cultural Resources Assessment of 59 Archaeological Sites Located Along Reaches 1 and 2 of the Tucson Aqueduct (Phase A) (2010)
The Bureau of Reclamation has developed an archaeological site database for the Central Arizona Project (CAP) canal main stem based on the Class III survey data that includes all previously recorded sites. An unknown number of these sites were either destroyed by construction or excavation, while others are no longer located within the CAP right-of-way (ROW). To assist Reclamation in checking the accuracy of its site database, Archaeological Consulting Services, Ltd. (ACS) was asked to revisit...
Photos from the Cultural Resources Assessment of 59 Archaeological Sites Located Along Reaches 1 and 2 of the Tucson Aqueduct (Phase A) (2010)
The Bureau of Reclamation has developed an archaeological site database for the Central Arizona Project (CAP) canal main stem based on the Class III survey data that includes all previously recorded sites. An unknown number of these sites were either destroyed by construction or excavation, while others are no longer located within the CAP right-of-way (ROW). To assist Reclamation in checking the accuracy of its site database, Archaeological Consulting Services, Ltd. (ACS) was asked to revisit...