A Class III Cultural Resources Survey of Instrument Site P-44 and a Buried Utility Line, Nye County, Nevada (1990)
DOCUMENT Full-Text Gregory H. Henton. Dan Amick.

The Department of Energy wishes to obtain archeological clearance to construct an instrument site approximately 8.6 km (5.4 miles) from existing instrument sites in the southeast portion of Cactus Flat. The areas to be affected included an instrument site pad about 90 by 90 m (295 by 295 feet) in size, and a buried 8.6 km utilities alignment.