Construction for this undertaking wIII include preparing one 46m x ·1-6 m (150 ft x 150 ft) improved gravel pad for the system as well as blading a 160 m (528 ft) 1ong access road linking the new system site with an existing paved rond. A pedestrian survey for cultural resources was conducted at the proposed system pad and along the proposed access road on August 07, 2001. No cultural resources were found in the area-of-potential-effect (APE). Consequently. the planned construction activity...
A Class III Cultural Resources Survey of Instrument Site P-44 and a Buried Utility Line, Nye County, Nevada (1990)
The Department of Energy wishes to obtain archeological clearance to construct an instrument site approximately 8.6 km (5.4 miles) from existing instrument sites in the southeast portion of Cactus Flat. The areas to be affected included an instrument site pad about 90 by 90 m (295 by 295 feet) in size, and a buried 8.6 km utilities alignment.