ANC-03057 (Site Name Keyword)

1-3 (3 Records)

Doyon Utilities Raptor Transmission Line Phase I Archaeological Survey Report, United States Air Force Joint Base Elmendorf-Richardson, Alaska (2012)
DOCUMENT Full-Text Morgan R. Blanchard. Andy Higgs.

Doyon Utilities, LLC implemented the construction of the Raptor Transmission Line (RTL) located on Joint Base Elmendorf-Richardson (JBER) at the direction of the 673d Civil Engineering Squadron to enhance the electrical distribution system found on the installation. Weston Solutions, Inc. (WS) has been contracted by Doyon Utilities to provide environmental permitting services for the project. WS contracted with Northern Land Use Research (NLUR) to conduct a Level I "reconnaissance"...


Joint Base Elmendorf-Richardson Resources
PROJECT Uploaded by: Rachel Fernandez

Project metadata for resources within the Joint Base Elmendorf-Richardson cultural heritage resources collection. This project is used to fill metadata for all resources part of the Joint Base Elmendorf-Richardson collection.


Level II Cultural Resources Survey of the Fort Richardson Internment Camp (FRIC), United States Air Force Joint Base Elmendorf-Richardson, Alaska (2016)
DOCUMENT Full-Text Morgan R. Blanchard.

Jacobs Engineering Group (Jacobs) contracted with Joint Base Elmendorf-Richardson (JBER) to provide archaeological support including but not limited to research and field study to support compliance with Section 106/110 requirements of the National Historic Preservation Act (NHPA) of 1966, as amended. As part of this effort, Jacobs subcontracted with Northern Land Use Research Alaska, LLC (NLURA) to conduct a Level II or “Evaluation” level survey of the Fort Richardson Internment Camp (FRIC)...