5MT10711, Photo #23539, Plan view, excavation in progress (2016)
IMAGE Jonathan Walker.

Burned construction materials identified in the northeast quadrant of Structure 101 (main chamber of pithouse), Stratum 2, Level 1. Photograph shaded.


5MT10711, Photo #23540, Plan view, excavation in progress (2016)
IMAGE Caitlin Sommer.

Possible northeast main support post identified in the northeast quadrant of Structure 101 (main chamber of pithouse), Stratum 2, Level 1.


5MT10711, Photo #23541, Other (2016)
IMAGE Caitlin Sommer.

Side view of partially excavated post (possibly the northeast main support) identified in the northeast quadrant of Structure 101 (main chamber of pithouse), Stratum 2, Level 1.


5MT10711, Photo #23542, Other (2016)
IMAGE Caitlin Sommer.

Oblique view of partially excavated post (possibly the northeast main support) identified in the northeast quadrant of Structure 101 (main chamber of pithouse), Stratum 2, Level 1.


5MT10711, Photo #23543, Plan view (2016)
IMAGE Steve Copeland.

Northeast main support post prior to collection from east half of Structure 103 (antechamber of pithouse), Stratum 2, Level 1.


5MT10711, Photo #23544, Plan view (2016)
IMAGE Steve Copeland.

Northeast main support post prior to collection from east half of Structure 103 (antechamber of pithouse), Stratum 2, Level 1.


5MT10711, Photo #23545, Other (2016)
IMAGE Steve Copeland.

Northeast main support post prior to collection from east half of Structure 103 (antechamber of pithouse), Stratum 2, Level 1.


5MT10711, Photo #23546, Plan view (2016)
IMAGE Steve Copeland.

Closing material identified in the southeast quadrant of Structure 101 (main chamber of pithouse), Stratum 2, Level 2.


5MT10711, Photo #23547, Other (2016)
IMAGE Steve Copeland.

View of plaster peeling off the wall in the southeast quadrant of Structure 101 (main chamber of pithouse).


5MT10711, Photo #23548, Other (2016)
IMAGE Steve Copeland.

View of plaster peeling off the wall in the southeast quadrant of Structure 101 (main chamber of pithouse).


5MT10711, Photo #23549, Plan view, before excavation (2016)
IMAGE Steve Copeland.

Modern ground surface, 1-x-2-m unit 1474.5N 161E.


5MT10711, Photo #23550, Plan view, before excavation (2016)
IMAGE Steve Copeland.

Modern ground surface, 2-x-2-m unit 1438.5N 178.5E.


5MT10711, Photo #23551, Plan view (2016)
IMAGE Steve Copeland.

Remains of a post identified in fill above the bench in the east half of Structure 103 (antechamber of pithouse), Stratum 2, Level 1.


5MT10711, Photo #23552, Plan view (2016)
IMAGE Steve Copeland.

Remains of a post identified in fill above the bench in the east half of Structure 103 (antechamber of pithouse), Stratum 2, Level 1.


5MT10711, Photo #23553, Other (2016)
IMAGE Steve Copeland.

Side view of remains of a post identified in fill above the bench in the east half of Structure 103 (antechamber of pithouse), Stratum 2, Level 1.


5MT10711, Photo #23554, Plan view, excavation in progress (2016)
IMAGE Steve Copeland.

Wall closing material identified in the northeast quadrant of Structure 101 (main chamber of pithouse), Stratum 2, Level 1.


5MT10711, Photo #23555, Plan view, excavation in progress (2016)
IMAGE Steve Copeland.

Wall closing material identified in the northeast quadrant of Structure 101 (main chamber of pithouse), Stratum 2, Level 1.


5MT10711, Photo #23556, Plan view, excavation in progress (2016)
IMAGE Steve Copeland.

Wall closing material identified in the northeast quadrant of Structure 101 (main chamber of pithouse), Stratum 2, Level 1.


5MT10711, Photo #23557, Plan view, excavation in progress (2016)
IMAGE Steve Copeland.

Wall closing material identified in the northeast quadrant of Structure 101 (main chamber of pithouse), Stratum 2, Level 1.


5MT10711, Photo #23558, Plan view, excavation in progress (2016)
IMAGE Steve Copeland.

Wall closing material identified in the northeast quadrant of Structure 101 (main chamber of pithouse), Stratum 2, Level 1.


5MT10711, Photo #23559, Plan view, excavation in progress (2016)
IMAGE Steve Copeland.

Wall closing material identified in the northeast quadrant of Structure 101 (main chamber of pithouse), Stratum 2, Level 1.


5MT10711, Photo #23560, Plan view, excavation in progress (2016)
IMAGE Steve Copeland.

Wall closing material identified in the northeast quadrant of Structure 101 (main chamber of pithouse), Stratum 2, Level 1.


5MT10711, Photo #23561, Plan view, excavation in progress (2016)
IMAGE Steve Copeland.

Close-up of wall closing material identified in the northeast quadrant of Structure 101 (main chamber of pithouse), Stratum 2, Level 1.


5MT10711, Photo #23575, Plan view (2016)
IMAGE Steve Copeland.

Possible posts and beams with associated closing material identified in the northeast quadrant of Structure 101 (main chamber of pithouse), Stratum 2, Level 1, prior to collecting dendrochronology samples.


5MT10711, Photo #23576, Plan view (2016)
IMAGE Steve Copeland.

Possible posts and beams with associated closing material identified in the northeast quadrant of Structure 101 (main chamber of pithouse), Stratum 2, Level 1, prior to collecting dendrochronology samples.