Ridgeline Site (Site Name Keyword)

51-75 (955 Records)

5MT10711, Photo #23425, Plan view, before excavation (2016)
IMAGE Steve Copeland.

Modern ground surface, 1-x-1-m unit 1449N 174E.


5MT10711, Photo #23426, Plan view, before excavation (2016)
IMAGE Steve Copeland.

Modern ground surface, 1-x-1-m unit 1449N 177E.


5MT10711, Photo #23427, Plan view, before excavation (2016)
IMAGE Steve Copeland.

Modern ground surface, 1-x-1-m unit 1450N 174E.


5MT10711, Photo #23428, Plan view, before excavation (2016)
IMAGE Steve Copeland.

Modern ground surface, 1-x-1-m unit 1449N 168E.


5MT10711, Photo #23429, Plan view, before excavation (2016)
IMAGE Caitlin Sommer.

Modern ground surface over possible structure, 2-x-2-m unit 1473N 156E. Note upright sandstone in northeast quarter of unit.


5MT10711, Photo #23468, Plan view, before excavation (2016)
IMAGE Steve Copeland.

View of pithouse after stripping of plowzone and before excavation. Photograph includes Stratum 1 of the northeast and southeast quadrants of Structure 101 (main chamber) and east half of Structure 103 (antechamber).


5MT10711, Photo #23469, Plan view, before excavation (2016)
IMAGE Steve Copeland.

View of pithouse after stripping of plowzone and before excavation. Photograph includes Stratum 1 of the east half of Structure 103 (antechamber).


5MT10711, Photo #23470, Plan view, before excavation (2016)
IMAGE Steve Copeland.

View of pithouse after stripping of plowzone and before excavation. Photograph includes Stratum 1 of the northeast and southeast quadrants of Structure 101 (main chamber) and east half of Structure 103 (antechamber).


5MT10711, Photo #23483, Plan view (2016)
IMAGE Steve Copeland.

Possible closing material made of sage identified in the northeast quadrant of Structure 101 (main chamber of pithouse), Stratum 1, Level 2.


5MT10711, Photo #23493, Plan view, before excavation (2016)
IMAGE Steve Copeland.

Modern ground surface, 1-x-1-m unit 1447N 172E.


5MT10711, Photo #23499, Plan view, excavation in progress (2016)
IMAGE Steve Copeland.

View of sandstone present in 2-x-2-m unit, 1473, Stratum 1. Investigating possible surface room.


5MT10711, Photo #23500, Plan view, excavation in progress (2016)
IMAGE Steve Copeland.

View of sandstone present in 2-x-2-m unit, 1473, Stratum 1. Investigating possible surface room.


5MT10711, Photo #23501, Plan view, excavation in progress (2016)
IMAGE Steve Copeland.

View of sandstone present in 2-x-2-m unit, 1473, Stratum 1. Investigating possible surface room.


5MT10711, Photo #23502, Plan view, final excavation photo (2016)
IMAGE Steve Copeland.

Undisturbed native sediment, 1-x-1-m unit 1447N 172E.


5MT10711, Photo #23503, Profile view, stratigraphy (2016)
IMAGE Steve Copeland.

Final stratigraphic profile, 1-x-1-m unit 1447N 172E, showing modern ground surface and strata 1-2.


5MT10711, Photo #23504, Field crew photo (2016)
IMAGE Steve Copeland.

2016 College Field School (Ridgeline Crew).


5MT10711, Photo #23505, Field crew photo (2016)
IMAGE Steve Copeland.

2017 College Field School (Ridgeline Crew) screening.


5MT10711, Photo #23506, Plan view (2016)
IMAGE Steve Copeland.

Wall closing material in situ, identified in the northeast quadrant of Structure 101 (main chamber of pithouse), Stratum 2.


5MT10711, Photo #23507, Plan view (2016)
IMAGE Steve Copeland.

Close-up of wall closing material in situ, identified in the northeast quadrant of Structure 101 (main chamber of pithouse), Stratum 2.


5MT10711, Photo #23508, Plan view (2016)
IMAGE Steve Copeland.

Close-up of wall closing material in situ, identified in the northeast quadrant of Structure 101 (main chamber of pithouse), Stratum 2.


5MT10711, Photo #23509, Plan view (2016)
IMAGE Steve Copeland.

Close-up of wall closing material in situ, identified in the northeast quadrant of Structure 101 (main chamber of pithouse), Stratum 2.


5MT10711, Photo #23510, Plan view (2016)
IMAGE Steve Copeland.

Close-up of wall closing material in situ, identified in the northeast quadrant of Structure 101 (main chamber of pithouse), Stratum 2.


5MT10711, Photo #23511, Plan view (2016)
IMAGE Steve Copeland.

Close-up of wall closing material in situ, identified in the northeast quadrant of Structure 101 (main chamber of pithouse), Stratum 2.


5MT10711, Photo #23512, Plan view (2016)
IMAGE Jonathan Walker.

Burned post in situ, identified in the east half of Structure 103 (antechamber of pithouse), Stratum 1, Level 1.


5MT10711, Photo #23513, Plan view (2016)
IMAGE Jonathan Walker.

Burned post in situ, identified in the east half of Structure 103 (antechamber of pithouse), Stratum 1, Level 1.