5MT10711 (Site Name Keyword)

276-300 (955 Records)

5MT10711, Photo #24235, Plan view, feature before excavation (2016)
IMAGE Rebecca (Becca) Simon.

Features 20 and 21 on the bench in the southeast quadrant of Structure 101 (pithouse main chamber).


5MT10711, Photo #24236, Plan view, feature before excavation (2016)
IMAGE Rebecca (Becca) Simon.

Features 21, 22, and 23 on the bench in the southeast quadrant of Structure 101 (pithouse main chamber).


5MT10711, Photo #24237, Plan view, feature before excavation (2016)
IMAGE Rebecca (Becca) Simon.

Features 23 and 25 on the bench in the southeast quadrant of Structure 101 (pithouse main chamber).


5MT10711, Photo #24238, Plan view, feature before excavation (2016)
IMAGE Rebecca (Becca) Simon.

Features 25, 24, and 26 on the bench in the southeast quadrant of Structure 101 (pithouse main chamber).


5MT10711, Photo #24239, Plan view, feature before excavation (2016)
IMAGE Rebecca (Becca) Simon.

Features 24 and 26 on the bench in the southeast quadrant of Structure 101 (pithouse main chamber).


5MT10711, Photo #24240, Profile view, feature (2016)
IMAGE Daniel Hampson.

Profile view Feature 1 in the east half of Structure 103 (pithouse antechamber) where the bench is undercut by cultural fill.


5MT10711, Photo #24241, Profile view, feature (2016)
IMAGE Daniel Hampson.

Profile view Feature 1 in the east half of Structure 103 (pithouse antechamber) where the bench is undercut by cultural fill.


5MT10711, Photo #24242, Profile view, feature (2016)
IMAGE Daniel Hampson.

Profile view Feature 1 in the east half of Structure 103 (pithouse antechamber) where the bench is undercut by cultural fill.


5MT10711, Photo #24251, Plan view, excavation in progress (2016)
IMAGE Shanna Diederichs.

Surface 1 in 2-x-2-m unit 1471.50N 166E with exposed artifacts in the south half of unit and possible rooms in the north half.


5MT10711, Photo #24252, Plan view, excavation in progress (2016)
IMAGE Shanna Diederichs.

Surface 1 in 2-x-2-m unit 1471.50N 166E with exposed artifacts in the south half of unit and possible rooms in the north half.


5MT10711, Photo #24253, Plan view, excavation in progress (2016)
IMAGE Shanna Diederichs.

Surface 1 in 2-x-2-m unit 1471.50N 166E with exposed artifacts in the south half of unit and possible rooms in the north half.


5MT10711, Photo #24254, Plan view, structure floor with assemblage (2016)
IMAGE Steve Copeland.

Surface 1 in the southeast quadrant of Structure 101 (pithouse main chamber).


5MT10711, Photo #24255, Plan view, structure floor with assemblage (2016)
IMAGE Steve Copeland.

Surface 1 in the southeast quadrant of Structure 101 (pithouse main chamber).


5MT10711, Photo #24256, Plan view, structure floor with assemblage (2016)
IMAGE Steve Copeland.

Surface 1 in the southeast quadrant of Structure 101 (pithouse main chamber).


5MT10711, Photo #24257, Plan view, structure floor with assemblage (2016)
IMAGE Steve Copeland.

Surface 1 in the southeast quadrant of Structure 101 (pithouse main chamber) behind wing wall.


5MT10711, Photo #24258, Plan view, structure floor with assemblage (2016)
IMAGE Steve Copeland.

Surface 1 in the southeast quadrant of Structure 101 (pithouse main chamber).


5MT10711, Photo #24259, Plan view, structure floor with assemblage (2016)
IMAGE Steve Copeland.

Surface 1 in the southeast quadrant of Structure 101 (pithouse main chamber).


5MT10711, Photo #24260, Plan view, structure floor with assemblage (2016)
IMAGE Steve Copeland.

Surface 1 in the southeast quadrant of Structure 101 (pithouse main chamber).


5MT10711, Photo #24261, Plan view, structure floor with assemblage (2016)
IMAGE Steve Copeland.

Surface 1 in the southeast quadrant of Structure 101 (pithouse main chamber) behind wing wall.


5MT10711, Photo #24388, Plan view, before excavation (2016)
IMAGE Steve Copeland.

Modern ground surface, 2-x2--m unit 1471.5N 166E.


5MT10711, Photo #24393, Plan view, before excavation (2016)
IMAGE Daniel Hampson.

Modern ground surface, 2-x-2-m unit 1438.5N 178.5E.


5MT10711, Photo #24394, Plan view, excavation in progress (2016)
IMAGE Daniel Hampson.

Plan view of roof construction identified in the northeast quadrant of Structure 101 (main chamber of pithouse), Stratum 3, Level 1.


5MT10711, Photo #24395, Plan view, excavation in progress (2016)
IMAGE Daniel Hampson.

Plan view of roof construction identified in the northeast quadrant of Structure 101 (main chamber of pithouse), Stratum 3, Level 1.


5MT10711, Photo #24396, Plan view, excavation in progress (2016)
IMAGE Daniel Hampson.

Plan view of roof construction identified in the northeast quadrant of Structure 101 (main chamber of pithouse), Stratum 3, Level 1.


5MT10711, Photo #24397, Plan view, excavation in progress (2016)
IMAGE Daniel Hampson.

Plan view of roof construction identified in the northeast quadrant of Structure 101 (main chamber of pithouse), Stratum 3, Level 1.