Deer Valley to Sycamore Transmission Line (Site Name Keyword)

1-3 (3 Records)

Agua Fria Energy Storage Project in Peoria, Arizona
PROJECT Andrew Vorsanger. AES Clean Energy.

AES proposes to develop the Agua Fria Energy Storage Project adjacent to the Arizona Public Service Company’s Raceway Substation in the City of Peoria, Maricopa County, Arizona. The proposed battery storage facility will be located on private land north of the Raceway Substation, with use of an existing access road within Bureau of Reclamation (BOR) administered land for the Central Arizona Project (CAP), located southeast of the substation. No specific project design for the battery storage...


Cultural Resources Inventory for the Agua Fria Energy Storage Project in Peoria, Maricopa County, Arizona (2022)
DOCUMENT Full-Text Andrew Vorsanger. Chris Whiting. Caitlin Hayden.

AES proposes to develop the Agua Fria Energy Storage Project adjacent to the Arizona Public Service Company’s Raceway Substation in the City of Peoria, Maricopa County, Arizona. The proposed battery storage facility will be located on private land north of the Raceway Substation, with use of an existing access road within Bureau of Reclamation (BOR) administered land for the Central Arizona Project (CAP), located southeast of the substation. No specific project design for the battery storage...


A Cultural Resources Survey of 61.22 Miles (371.03 Acres) of Federal and State Land for the Arizona Public Service M-001 (Deer Valley to Sycamore) 69-kV Transmission Line in Maricopa and Yavapai Counties, Arizona (2013)
DOCUMENT Full-Text Christopher Watkins. Scott Courtright. Chris North.

Arizona Public Service Company (APS) requested that Logan Simpson Design Inc. (LSD) conduct an intensive cultural resources survey of a 61.22-mile-long and 50-ft-wide (371.03-acres) segment of state and federal land along the M-001(Deer Valley to Sycamore) transmission line. This survey was requested for general inventory purposes and also in advance of proposed vegetation, maintenance activities within the project corridor. In addition, APS may conduct maintenance or construction projects...