A Class III Cultural Resources Inventory of 275 Miles of the Western Transmission System, from the Navajo Generating Station in Page, Coconino County, Arizona, to the McCullough Substation near Henderson, Clark County, Nevada - Volume 1: Arizona (2017)
DOCUMENT
Full-Text
The Salt River Project Agricultural Improvement and Power District (SRP) requested that Logan Simpson conduct a Class 111 cultural resources inventory of 275 miles (7,200 acres) of the existing Western Transmission System (WTS) right-of-way (ROW) in Arizona, Utah, and Nevada. The project area is a linear easement of 200 or 330 ft in width for the existing extra-high WTS voltage transmission line. The transmission line is part of the NGS transmission system and extends from the NGS near Page,...