Pueblo Grande Irrigation Sites (Site Name Keyword)
1-1 (1 Record)
Draft Archaeological Monitoring Report for the SRP Grand Canal Lining Project between 40th Street and State Route 143 in Phoenix, Maricopa County, Arizona (2008)
DOCUMENT
Full-Text
SRP is responsible for management of a 131-mile system of canals, which must be maintained year round. To allow for the performance of routine maintenance and canal improvements, portions of main canals within the SRP network are "dried up" for a one-month period during the fall and winter seasons. As part of a larger effort to reduce erosion and water loss through ground seepage, the Grand Canal lining project was conducted to install a protective concrete lining along a previously unlined...