Springhead Site (Site Name Keyword)
1-2 (2 Records)
BLM Utah Project Metadata
Kern River 2003 Expansion Project, Utah - Volume III: Prehistoric Site Reports, Part 5 (2004)
PROJECT
Uploaded by: Rachel Fernandez
Project metadata for cultural resources reports scanned from the Utah BLM office.
Kern River 2003 Expansion Project, Utah - Volume III: Prehistoric Site Reports, Part 5 (2004)
DOCUMENT
Full-Text
The Kern River 2003 Expansion Project consisted of the installation of a natural gas pipeline from near Opal, Wyoming to a terminus in the vicinity of Bakersfield, California. The project was an expansion of the existing 36-inch diameter pipeline through the construction of 717 miles of additional 36 and 42 inch pipeline loops, several new compressor stations, and modifications to existing compressor stations, meter stations and various other supporting facilities. Cultural resources along the...