Chee Nee Canal (Site Name Keyword)
1-3 (3 Records)
This document presents the results of a Class III cultural resources survey with management recommendations for the Salt River Project’s (SRP) 115kV Coolidge to Hayden electrical transmission line right-of-way (ROW) in District 1 of the Gila River Indian Community (GRIC), Pinal County, Arizona. The survey was completed by the GRIC Cultural Resources Management Program (CRMP; Project No. 2015.16sl), at the request of SRP, and in compliance with Section 106 of the National Historic Preservation...
A Class One Overview for the Proposed San Carlos Irrigation Project Joint Works Rehabilitation
The Bureau of Reclamation, Phoenix Area Office (Reclamation), undertook the development of a Water Management Plan (WMP) as part of the Central Arizona Project (CAP). In consultation with the San Carlos Irrigation Project (SCIP), the Gila River Indian Community (GRIC), and the San Carlos Irrigation and Drainage District (SCIDD), it was proposed that the Joint Works would require rehabilitation or replacement to facilitate the WMP, specifically the delivery of water to the Pima-Maricopa...
A Class One Overview for the Proposed San Carlos Irrigation Project Joint Works Rehabilitation: Report (1995)
The Bureau of Reclamation, Phoenix Area Office (Reclamation), undertook the development of a Water Management Plan (WMP) as part of the Central Arizona Project (CAP). In consultation with the San Carlos Irrigation Project (SCIP), the Gila River Indian Community (GRIC), and the San Carlos Irrigation and Drainage District (SCIDD), it was proposed that the Joint Works would require rehabilitation or replacement to facilitate the WMP, specifically the delivery of water to the Pima-Maricopa...