Poston Canal (Site Name Keyword)

1-3 (3 Records)

A Class One Overview for the Proposed San Carlos Irrigation Project Joint Works Rehabilitation
PROJECT David Doyel. USDI Bureau of Reclamation, Phoenix Area Office.

The Bureau of Reclamation, Phoenix Area Office (Reclamation), undertook the development of a Water Management Plan (WMP) as part of the Central Arizona Project (CAP). In consultation with the San Carlos Irrigation Project (SCIP), the Gila River Indian Community (GRIC), and the San Carlos Irrigation and Drainage District (SCIDD), it was proposed that the Joint Works would require rehabilitation or replacement to facilitate the WMP, specifically the delivery of water to the Pima-Maricopa...


A Class One Overview for the Proposed San Carlos Irrigation Project Joint Works Rehabilitation: Report (1995)
DOCUMENT Full-Text David Doyel. Joseph Crary. Gina Gage. Karolyn Jackman Jensen.

The Bureau of Reclamation, Phoenix Area Office (Reclamation), undertook the development of a Water Management Plan (WMP) as part of the Central Arizona Project (CAP). In consultation with the San Carlos Irrigation Project (SCIP), the Gila River Indian Community (GRIC), and the San Carlos Irrigation and Drainage District (SCIDD), it was proposed that the Joint Works would require rehabilitation or replacement to facilitate the WMP, specifically the delivery of water to the Pima-Maricopa...


Cultural Resources Survey for the Pinal West to Dinosaur Extra-High Voltage Transmission Line, Pinal County, Arizona (2009)
DOCUMENT Full-Text T. Kathleen Henderson. Michael W. Lindeman. Tiffany C. Clark.

Class III cultural resources survey for an extra-high voltage transmission line connecting the Pinal West, Santa Rosa, Pinal Central, Abel, and Dinosaur Substations in Pinal County, Arizona.