AZ T:3:4 (ASM) (Site Name Keyword)

1-2 (2 Records)

Final Report for Plan 6 Supplemental Cultural Resource Surveys (1985)
DOCUMENT Full-Text Margerie Green. R. W. Effland, Jr.. J. H. King.

This final report reflects a year of on-call Class III cultural resource surveys for Plan 6, the Regulatory Storage Division of the Central Arizona Project. Included are eight reports representing close to 6000 acres of survey performed in the vicinity of the planned New Waddell Dam by Archaeological Consulting Services for the Arizona Projects Office, U.S. Bureau of Reclamation. Because New Waddell Dam is designed to be rock filled, one of the focal points of the contract was to survey proposed...


The Lake Pleasant Project: A Preliminary Report on the Excavation of the Beardsley Canal Site, a Colonial Hohokam Village on the Agua Fria River, Central Arizona (1971)
DOCUMENT Full-Text Paul R. Fish.

The following preliminary report outlines the archaeological investigation of a site within the right-of-way of Arizona Highway Department Project S-434-505 (Lake Pleasant Section) on State Route 74, the Morristown-New River Highway. The excavated portion of the site will be destroyed by construction of the roadway. Excavation was carried out by the Arizona State Museum in cooperation with the Arizona State Highway Department under the Statewide Archaeological Highway Salvage Program.