At the request of The Salt River Project, archeologists from the Museum of Northern Arizona surveyed 24 tower locations and their associated access roads for the 7.5 mile segment of the Coronado-Silverking 500 kV transmission line in the Sitgreaves National Forest. The request for the survey came from Bettina Rosenberg, archeological administrator for The Salt River Project, in a letter dated January 12, 1978. The Coronado-Silverking transmission line is the main conduit to the Phoenix...
Archaeological Investigations: Salt River Project, Coronado-Silverking Transmission Line, Sitgreaves National Forest, Navajo County, Arizona: Final Report for Archaeological Survey of Three Sleeving Locations (1978)
On April 11, 1978, Steve Dosh, archaeologist at the Museum of Northern Arizona, surveyed three proposed sleeving locations for the construction of the Coronado-Silverking Transmission Line in the Sitgreaves National Forest. Jerry Shelly of the Salt River Project construction staff requested the surveys, and was present during their execution. This work is a part of Dosh's duties as transmission line construction monitor. All the sleeving locations inspected during the present survey are...
Archeological Investigations, Salt River Project, Coronado-Silverking Transmission Line East of Forest Service Boundary to APS-SRP, Joint Corridor, Private and Federal Lands, Navajo County, Arizona: Report for Archeological Survey of the Proposed Coronado-Silverking Transmission Line East of Forest Service Boundary to APS-SRP Joint Corridor (Station 3969+69.75 to 4377+01.91) (1978)
An intensive archeological survey of about 7.7 mi. of Salt River Project (SRP) Coronado-Silverking 500 KV transmission line easement extending from just east of the Sitgreaves National Forest to the APS-SRP Joint Corridor was conducted by Museum of Northern Arizona archeologists in December, 1977. The survey was requested by Bettina Rosenberg, SRP Archeological Administrator, in a letter dated December 12, 1977. The survey was conducted and this report prepared under the stipulations and...