AZ U:9:7 (ASM) (Site Name Keyword)

1-3 (3 Records)

End of Fieldwork Report: Archaeological Data Recovery and Burial Removal for a Proposed Building Footprint and Utilities Along a New Street Alignment; Excavations Related to Monitoring For Other Utilities Installations; and Excavations Related to Unanticipated Discoveries in the Washington Park Development at Pueblo Grande (AZ U:9:7[ASM]), Phoenix, Arizona, 2007-2008 (2008)
DOCUMENT Full-Text Banks L. Leonard. Brian E. Yunker. Rebecca J. Hill.

Three categories of activities are described in this report. A) Construction of a building and associated utilities would result in excavation below the grade to which previous archaeological data recovery and burial removal had occurred. In addition, the proposed construction would include modification to a landscaping easement, sidewalk, and curb along where the new street alignment would form an intersection, where no previous archaeological data recovery or burial removal had occurred....


Preliminary Report: Archaeological Monitoring of a U S West Communications Fiber Optic Cable Trench Along the South Side of the Grand Canal near Pueblo Grande National Historic Landmark, Phoenix, Maricopa County, Arizona (1994)
DOCUMENT Full-Text Holly S. DeMaagd. Barbara S. Macnider.

At the request of U S West Communications (US West), Archaeological Consulting Services, Ltd. (ACS) performed archaeological monitoring along a utility right-of-way. The right-of-way is within the south side access road for the Grand Canal, which passes through the City of Phoenix administered Pueblo Grande National Historic Landmark (Pueblo Grande; AZ U:9:7(ASM)). The canal is administered by the Salt River Project and owned by the Bureau of Reclamation. Limited testing within the right-of-way...


Trenching South of the Grand Canal at Pueblo Grande, Phoenix, Maricopa County, Arizona (1993)
DOCUMENT Full-Text Holly S. DeMaagd.

At the request of Janice Cunningham of U.S. West Communication (US West), Archaeological Consulting Services, Ltd. (ACS) performed subsurface testing along a proposed utility (fiber optic communication cable) right-of-way. The right-of-way will be located within the southern access road for the Grand Canal, which passes through Pueblo Grande Historic Landmark (Pueblo Grande). The canal is owned by the Bureau of Reclamation (Reclamation) and administered by the Salt River Project (SRP)....