Granite Reef Dam (Site Name Keyword)
1-3 (3 Records)
The following report presents the results of a 16-mile survey of the Verde Circuit 12kV distribution lines between Stewart Mountain and Granite Reef Dams, conducted by Statistical Research, Inc. (SRI), for the Salt River Project (SRP). Following the collection of permits and a systematic check of all records pertaining to archaeological resources in the proposed area of study, field investigation of the distribution lines was conducted from October 8 to 11, 1997. Field investigation of the...
A Class I Inventory of 9.61 Miles for the Thunderstone to Verde 69 kV Rebuild, Maricopa County, Arizona (2001)
On December 15, 2000, Entranco was authorized by Salt River Project (SRP) to conduct a Class I Inventory of an approximately 9.61-mile-long, variable width corridor from the Thunderstone Receiving Station to the Verde Substation in Maricopa County, Arizona. The project area includes Bureau of Indian Affairs right-of-way across the Salt River Pima-Maricopa Indian Community, and land under the jurisdiction of the Bureau of Reclamation, operated and managed by the Central Arizona Project and...
Historic Cultural Resources in Relation to the Central Arizona Water Control Study (1983)
Flooding along the Salt, Gila, Verde, and Agua Fria Rivers in February and March of 1978 resulted in extensive damage to property in Central Arizona and in the disruption of ground transportation and commerce in the greater Phoenix area. Major flooding also occurred along these rivers in December, 1978 and February, 1980. The recognition of this flooding problem, and of requirements for the regulatory storage of Central Arizona Project (CAP) water, prompted the U.S. Department of the Interior,...