AZ U:9:86 (ASM) (Site Name Keyword)

1-4 (4 Records)

Archaeological Monitoring and Discovery Plan for a Sign Rehabilitation and Replacement Project on Interstate 10 (Mileposts 145.5-156.3) and Several Crossroads in the Cities of Phoenix and Tempe, Maricopa County, Arizona (2004)
DOCUMENT Full-Text Toni Gentilli.

The Arizona Department of Transportation (ADOT) intends to conduct a sign rehabilitation and replacement project on Interstate 10 (1-10) from milepost (MP) 145.5-156.3 in the cities of Phoenix and Tempe, Maricopa County, Arizona (Figure 1). In addition to the 1-10 mainline, the project also will include sign installation and replacement on the following crossroads: 3rd Street, 7th Street, 16th Street, Washington Street, Jefferson Street, Sky Harbor Circle, Buckeye Road, 24th...


A Class I Cultural Resources Inventory of Nearly 11 Miles for the Interstate 10 Corridor Improvement Study, Buckeye Road to Baseline Road, Maricopa County, Arizona (2002)
DOCUMENT Full-Text Mary-Ellen Walsh. Teresa Rodrigues.

This report presents the results of a Class I cultural resources inventory of nearly 11 miles (mi.) of right-of-way (R/W) owned by the Arizona Department of Transportation (ADOT) along Interstate 10 (I-10) in Maricopa County, Arizona (Figures 1 and 2). Entranco completed the cultural resources inventory for DMJM+HARRIS under Contract No. 00-75, as part of an Environmental Impact Statement (EIS) for the I-10 Corridor Improvement Study. The purpose of the inventory was to determine whether...


Cultural Resource Survey of the Proposed Granite Reef Recharge Project, Salt River Indian Reservation, Maricopa County, Arizona (1990)
DOCUMENT Full-Text M. Zyniecki. Thomas N. Motsinger. David H. Greenwald.

An archaeological survey of a portion of the Salt River Indian Reservation was completed for the Salt River Project (SRP) by SWCA, Inc., Environmental Consultants, during July and August, 1990. Work was performed under special use permit Number 440 issued by the Bureau of Indian Affairs, Phoenix District, and a letter of authorization from the Salt River Indian Community. The project was undertaken for a proposed ground water recharge system located north of Mesa, Arizona, along the north side...


Cultural Resource Survey of the Proposed Granite Reef Recharge Project, Salt River Pima and Maricopa Indian Community, Maricopa County, Arizona (1990)
DOCUMENT Full-Text M. Zyniecki. Thomas N. Motsinger. David H. Greenwald.

An archaeological survey of a portion of the Salt River Pima and Maricopa Indian Community (SRPMIC) was completed for the Salt River Project (SRP) by SWCA, Inc., Environmental Consultants, during July and August, 1990. Work was performed under special use permit Number 440 issued by the Bureau of Indian Affairs, Phoenix District, and a letter of authorization from the Salt River Pima and Maricopa Indian Community. The project was undertaken for a proposed ground water recharge system located...