Gillespie Dam Site (Site Name Keyword)
1-5 (5 Records)
This chapter includes an analysis of the artifactual record that was recovered from the Gillespie Dam site 74-2 in Arizona. Through excavation for the project All American Pipeline artifacts included copper bells, fabric, shell, ground stone, bone, and carbonized plant remains.
Archaeology at the Gillespie Dam Site: Data Recovery Investigations for the Palo Verde to Pinal West 500 kV Transmission Line, Maricopa County, Arizona (2011)
In this report, the results of data recovery efforts conducted for the Palo Verde to Pinal West transmission line project at the Gillespie Dam site, AZ T:13:18 (ASM), in the Gila Bend area of the Gila River are presented. The site is a prehistoric Hohokam-Patayan settlement with an overlay of Historic era material. Fieldwork primarily occurred within the construction staging area of a transmission tower. Although covering less than an acre, the staging area contained surprising numbers of...
Cultural Resources Survey for the SRP Palo Verde to Pinal West 500 kV Transmission Lines, Maricopa and Pinal Counties, Arizona (2007)
This report presents the results of Class III cultural resources surveys conducted for the Palo Verde to Pinal West Transmission Line Project. The work was sponsored by Salt River Project (SRP) in support of two proposed 500 kV transmission lines that will connect the existing Hassayampa Switchyard, west of Phoenix, Maricopa County, Arizona, and the proposed Pinal West Substation, western Pinal County, Arizona. The cultural resources studies described here include three previous archaeological...
A Cultural Resources Survey of the Proposed Hassayampa-Jojoba Transmission Line, Maricopa County, Arizona (2002)
GBPP (Gila Bend Power Partners) proposes to construct and operate a 500kV transmission line, which will deliver electrical power from the Hassayampa Switchyard south of Wintersburg, Arizona to the Jojoba Switchyard currently under construction in south-central Maricopa County, Arizona. The project will increase the transmission of electrical power into areas surrounding metropolitan Phoenix, and will promote economic development of benefit to the people of Arizona. GBPP retained EPG...
Treatment and Data Recovery Plan for the SRP Palo Verde to Pinal West 500 kV Transmission Line, Maricopa and Pinal Counties, Arizona (2007)
Salt River Project Agricultural Improvement and Power District (SRP) plans to construct a new 500 kV transmission line between the existing Hassayampa Switchyard, west of Phoenix, Maricopa County, Arizona, and the proposed Pinal West Substation, western Pinal County, Arizona (Figure 1). Designated the Palo Verde to Pinal West (PV-PW) transmission line, this powerline is the first of two that SRP plans to eventually construct between the Hassayampa Switchyard and...