Bartlett Dam Upper Construction Camp (Site Name Keyword)
1-2 (2 Records)
In June 1986, the Bureau of Reclamation awarded a three-year contract for historical archaeological studies as part of the mitigation program for the Central Arizona Project's Regulatory Storage Division, designated as Plan 6. These studies involved investigations at approximately 50 archaeological sites in 7 localities. The sites were destroyed, damaged, or altered as a result of constructing Plan 6, which created a regulatory reservoir for the CAP as well as repaired or replaced other dams...
The Historical Archaeology of Dam Construction Camps in Central Arizona, Volume 2C: Sites at Other Dams Along the Salt and Verde Rivers (1994)
In June 1986 the Bureau of Reclamation awarded Dames & Moore a contract for historical archaeology studies as part of the mitigation program for the Regulatory Storage Division (Plan 6) of the Central Arizona Project. Final reports on these studies are being issued in three volumes under the title, The Historical Archaeology of Dam Construction Camps in Central Arizona. Volume 1: Synthesis (1994) summarizes the entire project, Volume 3 (1986) details laboratory methods, and Volume 2 (1994)...