Roosevelt Dam Construction Site (Site Name Keyword)

1-2 (2 Records)

The Historical Archaeology of Dam Construction Camps in Central Arizona
PROJECT Cindy L. Myers. A. E. Rogge. USDI Bureau of Reclamation, Phoenix Area Office.

In June 1986, the Bureau of Reclamation awarded a three-year contract for historical archaeological studies as part of the mitigation program for the Central Arizona Project's Regulatory Storage Division, designated as Plan 6. These studies involved investigations at approximately 50 archaeological sites in 7 localities. The sites were destroyed, damaged, or altered as a result of constructing Plan 6, which created a regulatory reservoir for the CAP as well as repaired or replaced other dams...


A Plan for Archaeological Investigations at Historic Dam Construction Camps in Central Arizona (1987)
DOCUMENT Full-Text A. E. Rogge. Cindy L. Myers.

In June 1986, the Bureau of Reclamation awarded a three-year contract to Dames & Moore to undertake historical archaeological studies as part of the mitigation program for the Regulatory Storage Division (Plan 6) of the Central Arizona Project. This report presents a plan for guiding this research which will investigate about 45 archaeological sites. The proposed primary goal is to produce a social history of life in temporary construction camps at seven major water storage dams built in central...