The Embankment Site (Site Name Keyword)

1-2 (2 Records)

Archaeological Survey and Identification Testing Results and Data Recovery Plan for the Proposed Santa Cruz Interceptor: Phases II and IIl (2007)
DOCUMENT Full-Text Joseph Ezzo. David M.R. Barr. S. Jerome Hesse.

Pima County Wastewater Management proposes to construct a sewer line (the Santa Cruz Interceptor [SCI]) along the east bank of the Santa Cruz River. Phase I of this project, has already been completed. Phases II and III will include the installation of a 72-inch-diameter sewer line, manholes, access roads, and other necessary facilities. Under contract with Pima County, SWCA Environmental Consultants (SWCA) conducted an archaeological pedestrian survey and non-site identification testing of the...


Interstate 10 Frontage Road Project: Results of Archaeological Testing and a Plan for Data Recovery at AZ BB:13:110 (ASM) and AZ BB:13:159 (ASM), Tucson, Pima County, Arizona (1994)
DOCUMENT Full-Text Timothy W. Jones. Masa Tani. Kathy Cisco. Wilson Hughes.

Two primarily historic period sites were tested within the 1-10 corridor improvement right-of- way. The Embankment site, AZ BB:13:159 (ASM), is literally eroding out of the 1-10 embankment on the east side of the interstate. It was found to contain a basalt foundation with a possible preserved basement, and it may be the remains of a historic habitation. The El Dumpé site, AZ BB:13:110 (ASM), is a large mounded trash deposit located on both sides of the interstate, dating from the 1930s through...