AZ U:9:178(ASM) (Site Name Keyword)

1-3 (3 Records)

Cultural Resources Survey and Assessment of Red Mountain Freeway (State Route 202) From State Route 87 to US Highway 60 Mesa, Maricopa County, Arizona (1997)
DOCUMENT Full-Text Barbara S. Macnider. Holly DeMaagd. Karolyn Jackman Jenson. Shereen Lerner. Jerryll Moreno. Gerald A. Doyle.

In conjunction with an Environmental Impact Statement analysis being conducted for the Arizona Department of Transportation (ADOT) Red Mountain Freeway by Entranco Engineers, Inc., Archaeological Consulting Services, Ltd. (ACS) performed cultural resource investigations of proposed alternative alignments. A Class I survey, or literature review, was first prepared for a 55-square-mile area to assist the initial alternative selection process. A Class III survey of all...


Preliminary Results of Data Recovery at AZ U:9:178(ASM) Along the Arizona Department of Transportation Red Mountain Freeway (State Route 202) Project Right-of-Way (State Route 87 to Gilbert Road) (2000)
DOCUMENT Full-Text Richard Boston.

The Arizona Department of Transportation (ADOT) plans to extend the Red Mountain Freeway through Mesa, Arizona, from State Route (SR) 87 to US Highway (US) 60. This project will result in the construction of a new limited access six-lane freeway. Construction in the right-of-way is currently confined to the area between SR 87 and Gilbert Road. The proposed route runs through an area of dense historic and prehistoric cultural resources south of McDowell Road, and...


Results of Eligibility Testing and Data Recovery Plan for Multiple Locations and Sites Along the Arizona Department of Transportation Red Mountain Freeway (State Route 202) Project Right-of-Way (State Route 87 to Gilbert Road) (2016)
DOCUMENT Full-Text Margaret Glass. Richard Boston. Stephen W. Yost. Gina Gage. Bruce G. Phillips. Stephen C. Reichardt. Karolyn J. Jackman.

The Arizona Department of Transportation (ADOT) plans to extend the Red Mountain Freeway through Mesa, Arizona from State Route (SR) 87 to US Route (US) 60. This project will result in the construction of a new limited access six-lane freeway. Construction on the right-of-way is currently confined to the area between SR 87 and Gilbert Road. The proposed route runs through an area of dense historic and prehistoric cultural resources south of McDowell Road, and passes through the northern edge of...