The following document presents the results of an intensive archaeological resources survey of construction access roads for the Mead to Phoenix 500kV Transmission Line Project (Mead to Phoenix Project). The survey constituted one phase of cultural resource compliance undertaken for this project by SWCA, Inc., Environmental Consultants (SWCA), for Salt River Project (SRP). Other phases include relocation and re-evaluation (Anduze and Sorrell 1995) of sites previously recorded during survey of...
The Mead to Phoenix 500kV Transmission Line Project: The Results of Construction Monitoring at Archaeological Sites in Clark County, Nevada, and Mohave, Yavapai, and Maricopa Counties, Arizona (1996)
Salt River Project constructed a 500kV transmission line from Boulder City, Nevada, to near Phoenix, Arizona, during which SWCA, Inc., Environmental Consultants, monitored construction at 20 previously recorded archaeological sites. Monitoring took the form of damage assessments at six sites and one non-site location, active monitoring of construction at 15 sites, inspections of site conditions and reflagging at two sites, and examination of possible human remains and monitoring at one location...