AZ 1:3:10 (ASM) (Site Name Keyword)

1-3 (3 Records)

Archaeological Monitoring and Discovery Plan for a Sign Rehabilitation and Replacement Project on Interstate 10 (Mileposts 145.5-156.3) and Several Crossroads in the Cities of Phoenix and Tempe, Maricopa County, Arizona (2004)
DOCUMENT Full-Text Toni Gentilli.

The Arizona Department of Transportation (ADOT) intends to conduct a sign rehabilitation and replacement project on Interstate 10 (1-10) from milepost (MP) 145.5-156.3 in the cities of Phoenix and Tempe, Maricopa County, Arizona (Figure 1). In addition to the 1-10 mainline, the project also will include sign installation and replacement on the following crossroads: 3rd Street, 7th Street, 16th Street, Washington Street, Jefferson Street, Sky Harbor Circle, Buckeye Road, 24th...


Arizona Department of Transporation Environmental & Enhancement Group: An Addendum Cultural Resources Class I Overview Report for the 202L, South Mountain Freeway EIS & L/DCR Project, Maricopa County, Arizona (2005)
DOCUMENT Full-Text Mark Brodbeck. Jewel Touchin.

An addendum Class I overview to cover expanded portions of the State Route Loop 202 (202L), South Mountain Freeway, Environmental Impact Statement (EIS) & Location/Design Concept Report (L/DCR) study area along Interstate I-10 (I-10) and the State Route Loop 101 (101L) freeways that were not included in the initial Class I report (Burden 2002). This overview presents a comprehensive assessment of previous archaeological investigations and recorded archaeological sites and historic building...


A Class III Cultural Resources Inventory of 275 Miles of the Western Transmission System, from the Navajo Generating Station in Page, Coconino County, Arizona, to the McCullough Substation near Henderson, Clark County, Nevada - Volume 1: Arizona (2017)
DOCUMENT Full-Text Michael L. Terlep.

The Salt River Project Agricultural Improvement and Power District (SRP) requested that Logan Simpson conduct a Class 111 cultural resources inventory of 275 miles (7,200 acres) of the existing Western Transmission System (WTS) right-of-way (ROW) in Arizona, Utah, and Nevada. The project area is a linear easement of 200 or 330 ft in width for the existing extra-high WTS voltage transmission line. The transmission line is part of the NGS transmission system and extends from the NGS near Page,...