AZ S:8:2(ASM) (Site Name Keyword)
1-4 (4 Records)
In anticipation of the construction of the Granite Reef Aqueduct, a component of the Central Arizona Project, the Bureau of Reclamation, Phoenix Area Office contracted with Arizona State Museum to conduct a cultural resources inventory of the aqueduct right-of-way to evaluate the potential effect of the project to archaeological sites. Arizona State Museum archaeologists conducted the survey in the summer of 1972 and identified 32 archaeological sites (27 prehistoric and 5 historic) and 57...
Granite Reef: A Study in Desert Archaeology (1982)
Under contract with the Under contract with the Bureau of Reclamation, the Office of Cultural Resource Management (OCRM), Department of Anthropology, Arizona State University conducted the Granite Reef Aquedcut archaeological project over a period of five years to mitigate the adverse effects of aqueduct and water control feature construction. The project was organized around a series of archaeological surveys, data recovery tasks, and problem-oriented analyses that were guided by a consistent...
The Hayden Rhodes Large Site Resurvey: A Class III Cultural Resources Survey and Assessment Within 16 Archaeological Sites on Bureau of Reclamation Right-of-way Along the Hayden Rhodes Aqueduct (Central Arizona Project Canal) Between Quartzite and Phoenix, La Paz and Maricopa Counties, Arizona: Report (2014)
The Bureau of Reclamation has developed an archaeological site database for the Central Arizona Project (CAP) canal main stem based on Class III survey data that includes all previously recorded sites. An unknown number of these sites were either destroyed by construction or excavation, while others are no longer located within the CAP right-of-way (ROW). To assist Reclamation in checking the accuracy of its site database, Logan Simpson Design, Inc. was asked to relocate and record 16 sites that...
The Hayden-Rhodes Large Site Resurvey
The Bureau of Reclamation has developed an archaeological site database for the Central Arizona Project (CAP) canal main stem based on Class III survey data that includes all previously recorded sites. An unknown number of these sites were either destroyed by construction or excavation, while others are no longer located within the CAP right-of-way (ROW). To assist Reclamation in checking the accuracy of its site database, Logan Simpson Design, Inc. was asked to relocate and record 16 sites that...