AZ T:12:127 (ASM) (Site Name Keyword)
1-2 (2 Records)
The Arizona Department of Transportation (ADOT) initiated preparation of a new Environmental Impact Statement and Location/Design Concept Report in 2001 to consider alternatives to the findings of the 1988 South Mountain Freeway concept (SMCT 2001). In the summer of 2001, HDR Engineering, Inc. was contracted to provide services in connection with this project. The GRIC-CRMP was subcontracted to provide a Class I cultural resource overview of the study area (Burden 2002) and subsequently to...
A Cultural Resource Survey Along 75th and Southern Avenues, Maricopa County, Arizona (2000)
The city of Phoenix proposes to install a 25 million gallons per day (MGD) sewer lift station, gravity sewer routes, and a water line in Maricopa County, Arizona. A gravity sewer will be constructed along Southern Avenue. This sewer will terminate at a proposed 25 million gallons per day (MGD) permanent lift station. The lift station discharge will be carried north, by force mains, through the Salt River Crossing. The waterline will be constructed from the lift station. Logan Simpson Design Inc....