AZ U:6:7 (ASM) (Site Name Keyword)

1-2 (2 Records)

Archaeological Monitoring Report for the Salt River Project 69-kV Transmission Line Pole Replacement Between Rio Verde and Fountain Hills, Maricopa County, Arizona (2006)
DOCUMENT Full-Text Jodi Strohmayer.

This report presents the results of an archaeological monitoring program carried out under the provisions and procedures outlined in the survey report and archaeological monitoring and discovery plan (Strohmayer 2005a), which was approved by SRP, ASLD, SHPO, and ASM. The monitoring program was a historic preservation mitigation measure implemented at multiple portions of the project area where new poles were installed within the boundaries of eligible or potentially eligible archaeological sites...


A Cultural Resource Survey Report and Archaeological Monitoring and Discovery Plan for the Salt River Project 69-kV Transmission Line Pole Replacement Between Rio Verde and Fountain Hills, Maricopa County, Arizona (2005)
DOCUMENT Full-Text Jodi Strohmayer.

Salt River Project (SRP) maintains a 69-kilovolt (kV) transmission line between the Glenbrook substation in  Fountain  Hills  and  the  Rio  Verde  substation  in  the  community  of Rio  Verde  in  Maricopa  County, Arizona  (Figure  1).  The  transmission  line  is  currently  supported  by  30-year-old  wooden  poles,  which generally follow the alignment of McDowell Mountain Road.  In order to improve the overall  safety and durability of the transmission line, SRP intends to replace all of...