Archaeological Evaluation of Three Sites for the Goldfield-Silver King 230 kV Transmission Line, Near Superior, Arizona (2000)
DOCUMENT Full-Text Douglas R. Mitchell. Ron F. Ryden.

Salt River Project (SRP) is planning to install fiber optic communication on the Goldfield to Silver King 230 kV transmission line system on the Mesa and Globe Ranger districts in Pinal County, Arizona. The project will entail replacing a static line with a combination static-fiber optic line. This will require a wire trailer/puller and crane to be positioned near certain towers for wire pulling. Both pieces of equipment are rubber-tired to minimize ground disturbance. SWCA was contracted to...


A Cultural Resources Survey of 84.3 Acres of Tonto National Forest and Private Lands for the SRP Silver King to Goldfield 230kV Upgrade, North of Superior, Pinal County, Arizona (2008)
DOCUMENT Full-Text David A. Bild.

SRP is planning to upgrade the current carrying capacity of 18.3 miles of the existing Silver King to Goldfield 230kV line. In order to accomplish this, SRP plans to “bundle” the existing 230kV conductors by adding a second conductor to each of the three existing single-conductor phases. To add the new conductors, SRP will need to re-open some original access roads, and the selected wire, puller, sleeving, and anchor sites used during the original 1978 line construction. The existing...