Archaeological Consulting Services, Ltd. (ACS) monitored the realignment of the 1100 and 1103 pipelines across the Gila River below Gillespie Dam. The work was performed to determine if any buried archaeological deposits or features were present within the boundaries of previously recorded sites and to mitigate the effects of the project on such features. The work was conducted at the request of El Paso Natural Gas Company (EPNG) and based on recommendations resulting from the initial survey of...
An Archaeological Survey of Two Arizona River Crossings Along the All-American Pipeline (1984)
Archaeological Consulting Services (ACS) conducted an archaeological survey of two major Arizona river crossings along the proposed route of the All-American Pipeline at the request of Dr. Ed Weil, Cultural Resources Manager, Applied Conservation Technology (ACT). ACT is coordinating the entire cultural resource effort along this proposed pipeline from the Gulf of Mexico to the Pacific Ocean and has subcontracted with ACS to undertake the Arizona portion of the route. Because the placement of...
Cultural Resources Survey for the SRP Palo Verde to Pinal West 500 kV Transmission Lines, Maricopa and Pinal Counties, Arizona (2007)
This report presents the results of Class III cultural resources surveys conducted for the Palo Verde to Pinal West Transmission Line Project. The work was sponsored by Salt River Project (SRP) in support of two proposed 500 kV transmission lines that will connect the existing Hassayampa Switchyard, west of Phoenix, Maricopa County, Arizona, and the proposed Pinal West Substation, western Pinal County, Arizona. The cultural resources studies described here include three previous archaeological...
Trails, Rock Features, and Homesteading in the Gila Bend Area: A Report on the State Route 85, Gila Bend to Buckeye Archaeological Project (2008)
The Arizona Department of Transportation plans to widen State Route 85 to a four-lane freeway in the area between Buckeye and Gila Bend. This report presents the results of archaeological data recovery investigations conducted along State Route (SR) 85 for the Arizona Department of Transportation (Contract No. 02-59) by a research team assembled by the Office of Cultural Resource Management, Department of Anthropology at Arizona State University. The Area of Potential Effect (APE) was located...
Treatment and Data Recovery Plan for the SRP Palo Verde to Pinal West 500 kV Transmission Line, Maricopa and Pinal Counties, Arizona (2007)
Salt River Project Agricultural Improvement and Power District (SRP) plans to construct a new 500 kV transmission line between the existing Hassayampa Switchyard, west of Phoenix, Maricopa County, Arizona, and the proposed Pinal West Substation, western Pinal County, Arizona (Figure 1). Designated the Palo Verde to Pinal West (PV-PW) transmission line, this powerline is the first of two that SRP plans to eventually construct between the Hassayampa Switchyard and...