AZ T:13:121 (ASM) (Site Name Keyword)
1-3 (3 Records)
GBPP (Gila Bend Power Partners) proposes to construct and operate a 500kV transmission line, which will deliver electrical power from the Hassayampa Switchyard south of Wintersburg, Arizona to the Jojoba Switchyard currently under construction in south-central Maricopa County, Arizona. The project will increase the transmission of electrical power into areas surrounding metropolitan Phoenix, and will promote economic development of benefit to the people of Arizona. GBPP retained EPG...
Trails, Rock Features, and Homesteading in the Gila Bend Area: A Report on the State Route 85, Gila Bend to Buckeye Archaeological Project (2008)
The Arizona Department of Transportation plans to widen State Route 85 to a four-lane freeway in the area between Buckeye and Gila Bend. This report presents the results of archaeological data recovery investigations conducted along State Route (SR) 85 for the Arizona Department of Transportation (Contract No. 02-59) by a research team assembled by the Office of Cultural Resource Management, Department of Anthropology at Arizona State University. The Area of Potential Effect (APE) was located...
Treatment and Data Recovery Plan for the SRP Palo Verde to Pinal West 500 kV Transmission Line, Maricopa and Pinal Counties, Arizona (2007)
Salt River Project Agricultural Improvement and Power District (SRP) plans to construct a new 500 kV transmission line between the existing Hassayampa Switchyard, west of Phoenix, Maricopa County, Arizona, and the proposed Pinal West Substation, western Pinal County, Arizona (Figure 1). Designated the Palo Verde to Pinal West (PV-PW) transmission line, this powerline is the first of two that SRP plans to eventually construct between the Hassayampa Switchyard and...