AZ T:13:134 (ASM) (Site Name Keyword)
1-2 (2 Records)
This report presents the results of Class III cultural resources surveys conducted for the Palo Verde to Pinal West Transmission Line Project. The work was sponsored by Salt River Project (SRP) in support of two proposed 500 kV transmission lines that will connect the existing Hassayampa Switchyard, west of Phoenix, Maricopa County, Arizona, and the proposed Pinal West Substation, western Pinal County, Arizona. The cultural resources studies described here include three previous archaeological...
Treatment and Data Recovery Plan for the SRP Palo Verde to Pinal West 500 kV Transmission Line, Maricopa and Pinal Counties, Arizona (2007)
Salt River Project Agricultural Improvement and Power District (SRP) plans to construct a new 500 kV transmission line between the existing Hassayampa Switchyard, west of Phoenix, Maricopa County, Arizona, and the proposed Pinal West Substation, western Pinal County, Arizona (Figure 1). Designated the Palo Verde to Pinal West (PV-PW) transmission line, this powerline is the first of two that SRP plans to eventually construct between the Hassayampa Switchyard and...