A Cultural Resources Survey of 32.26 Miles (719 acres) of the Salt River Project Coronado to Silverking 500-kV Transmission Line, Apache-Sitgreaves National Forest, Coconino and Navajo Counties, Arizona (2013)
DOCUMENT Full-Text Tina Hart. Chris North.

Salt River Project (SRP) requested that Logan Simpson Design Inc. (LSD) conduct an intensive cultural resources survey of a 32.26-mile-long and 180- to 200-ft-wide (719-acre) segment of federal land along the existing SRP Coronado to Silverking 500-kV transmission line. This survey was requested in advance of proposed vegetation maintenance activities within the project corridor. Vegetation maintenance will be performed with mechanical mowing equipment, mounted on a track hoe or a rubber-tired...


A Cultural Resources Survey of 32.26 Miles (722 acres) of the Salt River Project Coronado to Silverking 500-kV Transmission Line, Apache-Sitgreaves and Tonto National Forests, Coconino, Gila, and Navajo Counties, Arizona (2012)
DOCUMENT Full-Text Tina Hart.

Salt River Project (SRP) requested that Logan Simpson Design Inc. (LSD) conduct an intensive cultural resources survey of a 32.26-mile-long and 180- to 200-ft-wide (722-acre) segment of federal land along the existing SRP Coronado to Silverking 500-kV transmission line. This survey was requested in advance of proposed vegetation-maintenance activities within the project corridor. Vegetation maintenance will be performed with mechanical mowing equipment, mounted on a track hoe or a rubber-tired...