AZ T:12:47 (ASM) (Site Name Keyword)

1-6 (6 Records)

Archaeological Investigations in the Phoenix Sky Harbor International Airport: A Class I and II Survey for the Master Plan Improvements Project (1993)
DOCUMENT Full-Text David H. Greenwald. M. Zyniecki.

This report presents the results of archival and archaeological document studies and archaeological testing for the Sky Harbor International Airport Master Plan Improvements project. Investigations were initiated on April 9, 1992, and completed on May 15, 1992, by SWCA, Inc. Environmental Consultants, under contract to Griener, Inc. Griener was under contract to the City of Phoenix Aviation Department to complete an environmental impact statement for expansion of airport facilities. The Federal...


Archaeological Test Excavations at Pueblo Salado, Area 6, and a Data Recovery Proposal, Phoenix Sky Harbor International Airport, Phoenix, Arizona (1994)
DOCUMENT Full-Text David H. Greenwald.

This report contains the results of archaeological testing (Part I) and a plan for data recovery (Part II) at Area 6 of the dispersed Classic and post-Classic period site of Pueblo Salado. During the course of conducting archaeological testing in Area 6, the City of Phoenix Aviation Department in consultation with the City of Phoenix Archaeologist determined that the archaeological remains contained important information potential and would require further investigation through a data recovery...


Archaeological Testing for the Consolidated Rental Car Facility, Phoenix, Maricopa County, Arizona (2002)
DOCUMENT Full-Text Chris North. John M. Lindly. Michael S. Foster.

This report presents the results of archaeological testing at the Consolidated Rental Car Facility in Phoenix, Arizona. Testing was conducted at the request of the City of Phoenix Aviation Department and the City Archaeologist under an on-call archaeological services contract between the City and SWCA, Inc. (Contract no. 90034) and was assigned project number PGM 2001-16 by the City of Phoenix Archaeology Section. SWCA conducted archaeological testing at the Consolidated Rental Car Facility...


A Cultural Resource Inventory for the Southwest Loop Freeway Project (1987)
DOCUMENT Full-Text Todd W. Bostwick. Glen E. Rice.

The Arizona Department of Transportation began plans in 1985 to construct a new highway (State Route 218) in the Phoenix metropolitan area which would extend around the western and southern sides of South Mountain. This is a report on the historic and prehistoric cultural resources of the area. The construction of State Route 218 will be funded by the State of Arizona, and this work has been conducted under the State Historic Preservation Act of 1982 (A.R.S. Title 41, Chapter 4.2, Article 1). A...


Hohokam Farming on the Salt River Floodplain: Refining Models and Analytical Methods (2004)
DOCUMENT Full-Text Uploaded by: Rachel Fernandez

This is the second of two volumes presenting the results of data recovery investigations at the Dutch Canal Ruin (AZ T:12:62 [ ASM]), conducted by Desert Archaeology, Inc., at the western end of the North Runway, Phoenix Sky Harbor International Airport. The Dutch Canal Ruin is a prehistoric agricultural site, dating between 1,700 and 500 years ago, consisting of fieldhouses and farmsteads scattered along a network of canals on the geological floodplain of the Salt River. The first volume...


Preliminary Results of Archaeological Testing and Recommendations for Monitoring, Additional Testing, and Data Recovery: Phoenix Sky Harbor International Airport Center Runway (7L-25R) Reconstruction Project (2001)
DOCUMENT Full-Text Richard L. Boston. Michael Droz. Kelly Melaniphy. Bruce G. Phillips. Shirley Powell. Kimberly Redman.

Archaeological Consulting Services, Ltd. (ACS), of Tempe, Arizona, has completed Phase I archaeological testing and small-scale data recovery at the Phoenix Sky Harbor International Airport. The “Phase I” testing and data recovery is actually the second of a multi-phase project. The first monitored geotechnical boring and coring (Ryan et al. 2001); subsequent phases will include additional monitoring, testing, and data recovery. ACS carried out these activities as a subcontractor to Kimley-Horn...