Archaeological Field Report of 8-5/S-1453 Intersection Improvements and Widening of S-5 (2009)
DOCUMENT Full-Text Chad C. Long.

"The Department proposes to widen the existing two-lane ditch section of S-5 to accommodate the addition of a turn lane at the truck entrance to Kimberly Clark in Aiken County, South Carolina (Figure 1). The project is approximately 0.5 mile in length. Existing right-of-way is 66 feet. Proposed new right-of-way ranges from 90 to 110 feet along the length ofS-5. However, 90 feet ofnew right-of-way will be acquired along the east side of S-5 (Sta 21 + 66.83) where a culvert extension is proposed."