AZ U:11:21 (ASU) (Site Name Keyword)
1-2 (2 Records)
The Salt River Project (SRP) is planning to upgrade the current carrying capacity of 18.3 miles of the existing Silver King to Goldfield 230kV line north of Queen Valley and Superior, Pinal County, Arizona. In order to accomplish this, SRP plans to “bundle” the existing 230kV conductors by adding a second conductor to each of the three existing single-conductor phases. This 230kV line was originally intended for two circuits of bundled conductors and permitted for such on Forest Service lands by...
A Work Plan for Further Investigations of Archaeological Sites Along the 500kV Tonto National Forest Boundary to Kyrene Transmission Line Route, Coronado Station Project, Pinal and Maricopa Counties, Arizona (1977)
An intensive survey of approximately 67 km (42 mi) of transmission line right-of-way between Kyrene and the Tonto National Forest boundary was completed by a 3-man crew in 15 days. A total of 144 field numbers were assigned to cultural materials encountered, ranging from a single flake or sherd to a large site or component thereof. Material recovered is summarized in Table 1, and locations are plotted on accompanying aerial photos. Isolated artifacts and small scatters were collected; samples (1...