power plant (Site Type Keyword)
1-5 (5 Records)
Historic American Engineering Record (HAER) No. AZ-20 presents a written historical summary and relevant historical documentation about the construction and use of the Crosscut Steam Plant, which provided the first non-hydroelectric power to Salt River Project customers in the Phoenix metropolitan area. The report contains a narrative description, photographs, drawings, and maps. The Crosscut Steam Plant facility is located in Tempe, AZ, near Mill Avenue and Washington Street on the north...
Historic American Engineering Record: Crosscut Steam Plant, Tempe, Maricopa County, Arizona (1991)
Historic American Engineering Record (HAER) No. AZ-20 presents a written historical summary and relevant historical documentation about the construction and use of the Crosscut Steam Plant, which provided the first non-hydroelectric power to Salt River Project customers in the Phoenix metropolitan area. The report contains a narrative description, photographs, drawings, and maps. The Crosscut Steam Plant facility is located in Tempe, AZ, near Mill Avenue and Washington Street on the north...
Historic Properties of the Cold War Era, Cape Cod Air Station, Massachusetts (1998)
This report presents the results of an inventory of Cold War era buildings and structures at Cape Cod Air Station (AS), which has operated as a missile early warning radar installation from 1979 to the present and is currently managed by the 21 SW. The purpose of the inventory was to evaluate the facilities at Cape Cod (AS) in terms of their eligibility for inclusion in the National Register of Historic Places (NRHP) within the historical context of the Cold War. All of the facilities at this...
Perimeter Acquisition Vehicle Entry Phased Array Warning System (PAVE PAWS) facilities at Cape Cod Air Station (AS), Massachusetts (1999)
Post-Cold War downsizing has resulted in a number of necessary changes to Cold War era facilities. Two of the Perimeter Acquisition Vehicle Entry Phased Array Warning System (PAVE PAWS) sites (Texas and Georgia) are no longer operational and have been partially dismantled. Several engineering projects required at the Cape Cod site have been determined to have adverse effects on the historic integrity of the radar facility. The Air Force, State Historic Preservation Officer, and the Advisory...
Salt River Project Diversion and Conveyance System Historic District: National Register of Historic Places Nomination Form (2017)
The Salt River Project Diversion and Conveyance Historic District consists of nine main canals, the diversion dam that feeds water to those canals, and one hydropower plant situated on one of those canals. The contributing properties are: Granite Reef Diversion Dam (a structure); the Southside Gatekeeper’s house at the dam (a building); three canals serving land on the north side of the Salt River (the Arizona, Grand, and New Crosscut canals, all structures); six canals serving land on the south...