20th Century (Temporal Keyword)
1,251-1,254 (1,254 Records)
This project outlined the challenges of evaluating military buildings under the "work of a master" standard of NRHP Criterion C and details research and analysis approaches.
Work of a Master? Addressing Evaluation of Routine or Prosaic Architecture by Famous Architects on Military Facilities - Flow Chart (Legacy 15-779) (2017)
This flow chart resulted from a project that outlined the challenges of evaluating military buildings under the "work of a master" standard of NRHP Criterion C and details research and analysis approaches.
Work of a Master? Addressing Evaluation of Routine or Prosaic Architecture by Famous Architects on Military Facilities - Report (Legacy 15-779) (2017)
This document outlines the challenges of evaluating military buildings under the "work of a master" standard of NRHP Criterion C and details research and analysis approaches. The guidance contains case studies and reference tools, including an annotated list of standard sources for performing evaluations, a reference checklist, and guidance on consulting with SHPO reviewers.
Yuma Wall Stabilization, Yuma Territorial State Prison, Arizona (1981)
The State Parks Board and department personnel have expressed the desirablility of developing a wall finish over the existing caliche material that could achieve the texture and color of the original white plaster used in the early 1900s. Previous work with cast-in-place concrete on a similar wall in the New Yard area was completed at a cost of $25.00 to $32.00 per square foot of wall face. A built-up roof frame was also considered in this report. Due to the natural appearance of the other...