Pueblo II (Temporal Keyword)

276-300 (3,500 Records)

5MT10631, Photo #23859, Plan view, feature (2016)
IMAGE Steve Copeland.

Feature 8 in Surface 1 of the northeast quadrant of Structure 101 (pithouse main chamber). Includes depressed area to the east.


5MT10631, Photo #23860, Plan view, feature (2016)
IMAGE Steve Copeland.

Feature 8 in Surface 1 of the northeast quadrant of Structure 101 (pithouse main chamber). Includes depressed area to the east.


5MT10631, Photo #23861, Plan view, feature (2016)
IMAGE Steve Copeland.

Feature 8 in Surface 1 of the northeast quadrant of Structure 101 (pithouse main chamber). Does not include depressed area.


5MT10631, Photo #23862, Plan view, feature (2016)
IMAGE Steve Copeland.

Close-up of Feature 8 in Surface 1 of the northeast quadrant of Structure 101 (pithouse main chamber). Does not include depressed area.


5MT10631, Photo #23863, Plan view, feature (2016)
IMAGE Steve Copeland.

Feature 8 in Surface 1 of the northeast quadrant of Structure 101 (pithouse main chamber). Does not include depressed area.


5MT10631, Photo #23864, Plan view, feature (2016)
IMAGE Steve Copeland.

Feature 8 in Surface 1 of the northeast quadrant of Structure 101 (pithouse main chamber). Includes depressed area to the east.


5MT10631, Photo #23865, Plan view, feature (2016)
IMAGE Steve Copeland.

Feature 8 in Surface 1 in the northeast quandrant of Structure 101 (pithouse main chamber) showing actual pit and depressed area that make the entire vault.


5MT10631, Photo #23866, Plan view, feature (2016)
IMAGE Steve Copeland.

Excavation in progress of Feature 10 in Surface 1 in the northeast quadrant of Structure 101 (pithouse main chamber) showing rocks in post hole.


5MT10631, Photo #23867, Plan view, feature (2016)
IMAGE Steve Copeland.

Excavation in progress of Feature 10 in Surface 1 in the northeast quadrant of Structure 101 (pithouse main chamber) showing rocks in post hole.


5MT10631, Photo #23868, Plan view, feature before excavation (2016)
IMAGE Rebecca (Becca) Simon.

Feature 8 in Surface 1 in Structure 114 (pithouse additional room).


5MT10631, Photo #23869, Plan view, feature (2016)
IMAGE Rebecca (Becca) Simon.

Features 3, 4, 6, and 7 in Surface 1 of Structure 114 (pithouse additional room).


5MT10631, Photo #23870, Plan view, feature (2016)
IMAGE Rebecca (Becca) Simon.

Features 3, 4, 6, and 7 in Surface 1 of Structure 114 (pithouse additional room).


5MT10631, Photo #23871, Plan view, feature (2016)
IMAGE Rebecca (Becca) Simon.

Feature 8 in Surface 1 of Structure 114 (pithouse main chamber), excavation in progress. Note the angle and decreasing diameter from surface to interior.


5MT10631, Photo #23872, Plan view, feature (2016)
IMAGE Rebecca (Becca) Simon.

Feature 8 in Surface 1 of Structure 114 (pithouse main chamber), excavation in progress. Note the angle and decreasing diameter from surface to interior.


5MT10631, Photo #23873, Plan view, feature (2016)
IMAGE Rebecca (Becca) Simon.

Feature 8 in Surface 1 of Structure 114 (pithouse main chamber), excavation in progress. Note the angle and decreasing diameter from surface to interior.


5MT10631, Photo #23874, Plan view, feature (2016)
IMAGE Daniel Hampson.

Feature 15 in Surface 1 in the northeast quadrant of Structure 101 (pithouse main chamber) before excavation. Feature 10 in Surface 1 in the northeast quadrant of Structure 101 (pithouse main chamber) after excavation. Note rodent run and window impacting


5MT10631, Photo #23875, Plan view, feature (2016)
IMAGE Daniel Hampson.

Feature 15 in Surface 1 in the northeast quadrant of Structure 101 (pithouse main chamber) before excavation. Feature 10 in Surface 1 in the northeast quadrant of Structure 101 (pithouse main chamber) after excavation. Note rodent run and window impacting


5MT10631, Photo #23876, Plan view, feature (2016)
IMAGE Daniel Hampson.

Feature 15 in Surface 1 in the northeast quadrant of Structure 101 (pithouse main chamber) before excavation. Feature 10 in Surface 1 in the northeast quadrant of Structure 101 (pithouse main chamber) after excavation. Note rodent run and window impacting


5MT10631, Photo #23877, Plan view, feature (2016)
IMAGE Daniel Hampson.

Feature 15 in Surface 1 in the northeast quadrant of Structure 101 (pithouse main chamber), excavation in progress after Feature 10 being excavated. Note rocks filling Feature 15 and calcium carbonate ring around the top of Feature 10.


5MT10631, Photo #23878, Profile view, feature (2016)
IMAGE Daniel Hampson.

Feature 15 in Surface 1 in the northeast quadrant of Structure 101 (pithouse main chamber), excavation in progress after Feature 10 being excavated. Note rocks filling Feature 15 and calcium carbonate ring around the top of Feature 10.


5MT10631, Photo #23879, Plan view, feature (2016)
IMAGE Steve Copeland.

Feature 9, Segment 1, in Surface 1 of the northeast quadrant of Structure 101 (pithouse main chamber).


5MT10631, Photo #23880, Plan view, feature (2016)
IMAGE Steve Copeland.

Feature 9, Segment 1, in Surface 1 of the northeast quadrant of Structure 101 (pithouse main chamber).


5MT10631, Photo #23881, Profile view, feature (2016)
IMAGE Steve Copeland.

Feature 9, Segment 1, in Surface 1 of the northeast quadrant of Structure 101 (pithouse main chamber).


5MT10631, Photo #23882, Plan view, feature (2016)
IMAGE Steve Copeland.

Feature 9 (whole feature) in Surface 1 of the northeast quadrant of Structure 101 (pithouse main chamber).


5MT10631, Photo #23883, Plan view, feature (2016)
IMAGE Steve Copeland.

Feature 9 (whole feature) in Surface 1 of the northeast quadrant of Structure 101 (pithouse main chamber).