Basketmaker III (Temporal Keyword)

2,676-2,700 (4,629 Records)

5MT10711, Photo #24072, Plan view, excavation in progress (2016)
IMAGE Daniel Hampson.

Reed bundle under sandstone noted within 10 cm of Surface 1 in the east half of Structure 103 (pithouse antechamber).


5MT10711, Photo #24073, Plan view, excavation in progress (2016)
IMAGE Daniel Hampson.

Reed bundle under sandstone noted within 10 cm of Surface 1 in the east half of Structure 103 (pithouse antechamber).


5MT10711, Photo #24074, Plan view, excavation in progress (2016)
IMAGE Daniel Hampson.

Reed bundle noted within 10 cm of Surface 1 in the east half of Structure 103 (pithouse antechamber).


5MT10711, Photo #24075, Face view, architecture (2016)
IMAGE Caitlin Sommer.

Plaster on bulk between main chamber and antechamber with a possible upright post in the southeast quadrant of Structure 101 (pithouse main chamber).


5MT10711, Photo #24076, Face view, architecture (2016)
IMAGE Caitlin Sommer.

Plaster on bulk between main chamber and antechamber with a possible upright post in the southeast quadrant of Structure 101 (pithouse main chamber).


5MT10711, Photo #24077, Face view, architecture (2016)
IMAGE Caitlin Sommer.

Plaster and upright sandstone slabs that make Feature 19 in the southeast quadrant of Structure 101 (pithouse main chamber).


5MT10711, Photo #24078, Face view, architecture (2016)
IMAGE Caitlin Sommer.

Plaster and upright sandstone slabs that make Feature 19 in the southeast quadrant of Structure 101 (pithouse main chamber).


5MT10711, Photo #24079, Plan view (2016)
IMAGE Steve Copeland.

Antler on Surface 1 in the southeast quadrant of Structure 101 (pithouse main chamber).


5MT10711, Photo #24080, Plan view (2016)
IMAGE Steve Copeland.

Antler on Surface 1 in the southeast quadrant of Structure 101 (pithouse main chamber).


5MT10711, Photo #24081, Face view, architecture (2016)
IMAGE Caitlin Sommer.

Feature 19 in the southeast quadrant of Structure 101 (pithouse main chamber) showing plaster and upright sandstone slabs, including those that collapsed with the roof fell. Excavation in progress.


5MT10711, Photo #24082, Plan view, feature (2016)
IMAGE Caitlin Sommer.

Feature 19 in the southeast quadrant of Structure 101 (pithouse main chamber) showing plaster and upright sandstone slabs, including those that collapsed with the roof fell. Excavation in progress.


5MT10711, Photo #24083, Face view, architecture (2016)
IMAGE Caitlin Sommer.

Feature 19 in the southeast quadrant of Structure 101 (pithouse main chamber) showing plaster and upright sandstone slabs, including those that collapsed with the roof fell. Excavation in progress.


5MT10711, Photo #24084, Face view, architecture (2016)
IMAGE Caitlin Sommer.

Feature 19 in the southeast quadrant of Structure 101 (pithouse main chamber) showing plaster and upright sandstone slabs, including those that collapsed with the roof fell. Excavation in progress.


5MT10711, Photo #24085, Face view, architecture (2016)
IMAGE Steve Copeland.

Feature 19 in the southeast quadrant of Structure 101 (pithouse main chamber). Excavation in progress.


5MT10711, Photo #24086, Face view, architecture (2016)
IMAGE Steve Copeland.

Feature 19 in the southeast quadrant of Structure 101 (pithouse main chamber). Excavation in progress.


5MT10711, Photo #24087, Face view, architecture (2016)
IMAGE Steve Copeland.

Feature 19 in the southeast quadrant of Structure 101 (pithouse main chamber). Excavation in progress.


5MT10711, Photo #24088, Face view, architecture (2016)
IMAGE Steve Copeland.

Feature 19 in the southeast quadrant of Structure 101 (pithouse main chamber). Close-up of east side. Excavation in progress.


5MT10711, Photo #24089, Face view, architecture (2016)
IMAGE Steve Copeland.

Feature 19 in the southeast quadrant of Structure 101 (pithouse main chamber), close-up. Excavation in progress.


5MT10711, Photo #24090, Plan view (2016)
IMAGE Steve Copeland.

Surface 1 in the northeast quadrant of Structure 101 (pithouse main chamber) before excavating features.


5MT10711, Photo #24091, Plan view (2016)
IMAGE Steve Copeland.

Surface 1 in the northeast quadrant of Structure 101 (pithouse main chamber) before excavating features.


5MT10711, Photo #24092, Plan view (2016)
IMAGE Steve Copeland.

Surface 1 in the northeast quadrant of Structure 101 (pithouse main chamber) before excavating features.


5MT10711, Photo #24093, Plan view, final excavation photo (2016)
IMAGE Steve Copeland.

Feature 1 in the northeast quadrant of Structure 101 (pithouse main chamber).


5MT10711, Photo #24094, Plan view, final excavation photo (2016)
IMAGE Steve Copeland.

Feature 1 in the northeast quadrant of Structure 101 (pithouse main chamber).


5MT10711, Photo #24095, Profile view, stratigraphy (2016)
IMAGE Steve Copeland.

Stratigraphic profile, northeast quadrant of Structure 101 (pithouse main chamber), showing strata 1-3 and Surface 1 (dry). Northern portion.


5MT10711, Photo #24096, Profile view, stratigraphy (2016)
IMAGE Steve Copeland.

Stratigraphic profile, northeast quadrant of Structure 101 (pithouse main chamber), showing strata 1-3 and Surface 1 (dry). Southern portion.