Basketmaker III (Temporal Keyword)

3,151-3,175 (4,629 Records)

5MT10711, Photo #25060, Plan view, final excavation photo (2017)
IMAGE Steve Copeland.

Final showing feature 43 and surface 2 in the southeast quadrant.


5MT10711, Photo #25061, Plan view, final excavation photo (2017)
IMAGE Steve Copeland.

Final showing feature 43 and surface 2 in the southeast quadrant.


5MT10711, Photo #25062, Plan view, final excavation photo (2017)
IMAGE Steve Copeland.

Rock removed during the excavation of feature 43.


5MT10711, Photo #25063, Plan view, before excavation (2017)
IMAGE Steve Copeland.

Showing feature 44 and surface 2 in the southeast quadrant.


5MT10711, Photo #25064, Face view, architecture (2017)
IMAGE Caitlin Sommer.

Showing the east wall feature 44 extending under feature 19 in the southeast quadrant.


5MT10711, Photo #25065, Face view, architecture (2017)
IMAGE Caitlin Sommer.

Showing the east wall feature 43 extending under feature 19 in the southeast quadrant.


5MT10711, Photo #25066, Plan view, final excavation photo (2017)
IMAGE Steve Copeland.

Showing features 33,43 and 44 in the southeast quadrant.


5MT10711, Photo #25067, Plan view, final excavation photo (2017)
IMAGE Steve Copeland.

Showing features 33,43 and 44 in the southeast quadrant.


5MT10711, Photo #25068, Plan view, final excavation photo (2017)
IMAGE Steve Copeland.

Showing features 33,43 and 44 in the southeast quadrant.


5MT10711, Photo #25069, Plan view, final excavation photo (2017)
IMAGE Steve Copeland.

Rocks removed from features 33,43 and 44 during excavation.


5MT10711, Photo #25070, Plan view, feature before excavation (2017)
IMAGE Steve Copeland.

Showing feature 45 and surface 2 in the northeast quadrant.


5MT10711, Photo #25071, Plan view, feature before excavation (2017)
IMAGE Steve Copeland.

Showing feature 45 and surface 2 in the northeast quadrant.


5MT10711, Photo #25073, Plan view, excavation in progress (2017)
IMAGE Caitlin Sommer.

Showing feature 45 and surface 2 before removing rubble inside the feature. The red plaster has been removed already.


5MT10711, Photo #25074, Plan view, excavation in progress (2017)
IMAGE Caitlin Sommer.

Showing feature 45 and surface 2 before removing rubble inside the feature. The red plaster has been removed already.


5MT10711, Photo #25075, Plan view, excavation in progress (2017)
IMAGE Caitlin Sommer.

Showing feature 45 and surface 2 before removing rubble inside the feature. The red plaster has been removed already.


5MT10711, Photo #25076, Other (2017)
IMAGE Caitlin Sommer.

Showing amount of rubble coming out of feature 45 in the northeast quadrant.


5MT10711, Photo #25077, Plan view, final excavation photo (2017)
IMAGE Caitlin Sommer.

Showing feature 45 and surface 2 in the northeast quadrant.


5MT10711, Photo #25078, Plan view, final excavation photo (2017)
IMAGE Caitlin Sommer.

Showing feature 45 and surface 2 in the northeast quadrant.


5MT10711, Photo #25079, Profile view, feature (2017)
IMAGE Caitlin Sommer.

East face of feature 45 in the northeast quadrant.


5MT10711, Photo #25080, Profile view, feature (2017)
IMAGE Caitlin Sommer.

East face of feature 45 in the northeast quadrant.


5MT10711, Photo #25081, Profile view, feature (2017)
IMAGE Caitlin Sommer.

Showing rubble and adobe in the upper half of feature 45 in the northeast quadrant.


5MT10711, Photo #25082, Profile view, feature (2017)
IMAGE Caitlin Sommer.

Showing rubble and adobe in the east profile of feature 45 in the northeast quadrant.


5MT10711, Photo #25085, Plan view, final excavation photo (2017)
IMAGE Steve Copeland.

Showing feature 47 and surface 2 in the northeast quadrant.


5MT10711, Photo #25086, Plan view, final excavation photo (2017)
IMAGE Steve Copeland.

Showing feature 47 and surface 2 in the northeast quadrant.


5MT10711, Photo #25087, Profile view, feature (2017)
IMAGE Steve Copeland.

Showing south face of feature 47 and surface 2 in the northeast quadrant.