Basketmaker III (Temporal Keyword)
3,701-3,725 (4,629 Records)
Stratum 6 Level 2, 2-x2-m unit 1436N 210E. Showing possible deflector and slab.
5MT2032, Photo #20460, Field crew photo (2014)
Shanna Diederichs clearing floor in northwest corner of pitroom. 10 cm above Surface 1, 2-x2-m unit 1440N 201E.
5MT2032, Photo #20461, Other (2014)
Jane Dillard at 5MT2032.
5MT2032, Photo #20462, Other (2014)
Pigment on overturned metate (PL 154). Surface 1, 2-x2-m unit 1436N 210E.
5MT2032, Photo #20483, Plan view, before excavation (2014)
Slab-lined room before excavation. Modern ground surface, 2-x2-m unit 1440N 201E.
5MT2032, Photo #20484, Plan view, before excavation (2014)
Slab-lined room before excavation. Modern ground surface, 2-x2-m unit 1440N 201E.
5MT2032, Photo #20485, Plan view, before excavation (2014)
Slab-lined room before excavation. Modern ground surface, 2-x2-m unit 1440N 201E.
5MT2032, Photo #20487, Plan view, before excavation (2014)
South wall of slab-lined room (outside of excavation unit). Modern ground surface, 2-x2-m unit 1440N 201E.
5MT2032, Photo #20488, Plan view, before excavation (2014)
West wall of slab-lined room (outside of excavation unit). Modern ground surface, 2-x2-m unit 1440N 201E.
5MT2032, Photo #20489, Plan view, before excavation (2014)
North wall of slab-lined room before excavation. Note double uprights along northwest edge. Modern ground surface, 2-x2-m unit 1440N 201E.
5MT2032, Photo #20490, Plan view, before excavation (2014)
East wall of slab lined room, just outside east side of unit. Modern ground surface, 2-x2-m unit 1440N 201E.
5MT2032, Photo #20491, Plan view (2014)
Possible roof beam before excavation, showing unburned portion in roof fall. Stratum 5, 2-x2-m unit 1436N 210E.
5MT2032, Photo #20492, Plan view (2014)
Possible roof beam before excavation, showing unburned portion in roof fall. Stratum 5, 2-x2-m unit 1436N 210E.
5MT2032, Photo #20493, Plan view, excavation in progress (2014)
Stratum 1 removed; Stratum 2 (structure material) showing. 2-x2-m unit 1440N 201E.
5MT2032, Photo #20495, Field crew photo (2014)
Steve Copeland propping up metate. Stratum 4 Level 2, 2-x2-m unit 1436N 210E.
5MT2032, Photo #20496, Plan view, excavation in progress (2014)
Detail of constuction material in Stratum 2. 2-x2-m unit 1440N 201E.
5MT2032, Photo #20497, Plan view, excavation in progress (2014)
Metate pieces in upper roof fall. Stratum 4 Level 2, 2-x2-m unit 1436N 210E.
5MT2032, Photo #20498, Plan view, excavation in progress (2014)
End of Stratum 2 Level 1, 2-x2-m unit 1440N 201E.
5MT2032, Photo #20499, Field crew photo (2014)
Steve Copeland and Caitlin Sommer excavating a large dendro. Stratum 4 Level 2, 2-x2-m unit 1436N 210E.
5MT2032, Photo #20500, Other (2014)
Oblique view of burned adobe cast from roofing. Two beam impressions. Stratum 4 Level 2, 2-x2-m unit 1436N 210E.
5MT2032, Photo #20501, Plan view, excavation in progress (2014)
Example of roofing material. 10 cm above Surface 1, 2-x2-m unit 1440N 201E.
5MT2032, Photo #20502, Plan view, excavation in progress (2014)
PL 8, 10 cm above Surface 1, 2-x2-m unit 1440N 201E.
5MT2032, Photo #20503, Plan view, excavation in progress (2014)
Possible adobe wing wall with probable upright post. Stratum 6 Level 1, 2-x2-m unit 1436N 210E.
5MT2032, Photo #20504, Plan view, excavation in progress (2014)
Closeup of possible upright post near wing wall. Stratum 6 Level 1, 2-x2-m unit 1436N 210E.
5MT2032, Photo #20505, Plan view, excavation in progress (2014)
Closeup of possible wing wall. Stratum 6 Level 1, 2-x2-m unit 1436N 210E.