Basketmaker III (Temporal Keyword)

3,701-3,725 (4,629 Records)

5MT2032, Photo #20458, Plan view (2014)
IMAGE Steve Copeland.

Stratum 6 Level 2, 2-x2-m unit 1436N 210E. Showing possible deflector and slab.


5MT2032, Photo #20460, Field crew photo (2014)
IMAGE Steve Copeland.

Shanna Diederichs clearing floor in northwest corner of pitroom. 10 cm above Surface 1, 2-x2-m unit 1440N 201E.


5MT2032, Photo #20461, Other (2014)
IMAGE Steve Copeland.

Jane Dillard at 5MT2032.


5MT2032, Photo #20462, Other (2014)
IMAGE Caitlin Sommer.

Pigment on overturned metate (PL 154). Surface 1, 2-x2-m unit 1436N 210E.


5MT2032, Photo #20483, Plan view, before excavation (2014)
IMAGE Shanna Diederichs.

Slab-lined room before excavation. Modern ground surface, 2-x2-m unit 1440N 201E.


5MT2032, Photo #20484, Plan view, before excavation (2014)
IMAGE Shanna Diederichs.

Slab-lined room before excavation. Modern ground surface, 2-x2-m unit 1440N 201E.


5MT2032, Photo #20485, Plan view, before excavation (2014)
IMAGE Shanna Diederichs.

Slab-lined room before excavation. Modern ground surface, 2-x2-m unit 1440N 201E.


5MT2032, Photo #20487, Plan view, before excavation (2014)
IMAGE Shanna Diederichs.

South wall of slab-lined room (outside of excavation unit). Modern ground surface, 2-x2-m unit 1440N 201E.


5MT2032, Photo #20488, Plan view, before excavation (2014)
IMAGE Shanna Diederichs.

West wall of slab-lined room (outside of excavation unit). Modern ground surface, 2-x2-m unit 1440N 201E.


5MT2032, Photo #20489, Plan view, before excavation (2014)
IMAGE Shanna Diederichs.

North wall of slab-lined room before excavation. Note double uprights along northwest edge. Modern ground surface, 2-x2-m unit 1440N 201E.


5MT2032, Photo #20490, Plan view, before excavation (2014)
IMAGE Shanna Diederichs.

East wall of slab lined room, just outside east side of unit. Modern ground surface, 2-x2-m unit 1440N 201E.


5MT2032, Photo #20491, Plan view (2014)
IMAGE Steve Copeland.

Possible roof beam before excavation, showing unburned portion in roof fall. Stratum 5, 2-x2-m unit 1436N 210E.


5MT2032, Photo #20492, Plan view (2014)
IMAGE Steve Copeland.

Possible roof beam before excavation, showing unburned portion in roof fall. Stratum 5, 2-x2-m unit 1436N 210E.


5MT2032, Photo #20493, Plan view, excavation in progress (2014)
IMAGE Shanna Diederichs.

Stratum 1 removed; Stratum 2 (structure material) showing. 2-x2-m unit 1440N 201E.


5MT2032, Photo #20495, Field crew photo (2014)
IMAGE Shanna Diederichs.

Steve Copeland propping up metate. Stratum 4 Level 2, 2-x2-m unit 1436N 210E.


5MT2032, Photo #20496, Plan view, excavation in progress (2014)
IMAGE Shanna Diederichs.

Detail of constuction material in Stratum 2. 2-x2-m unit 1440N 201E.


5MT2032, Photo #20497, Plan view, excavation in progress (2014)
IMAGE Steve Copeland.

Metate pieces in upper roof fall. Stratum 4 Level 2, 2-x2-m unit 1436N 210E.


5MT2032, Photo #20498, Plan view, excavation in progress (2014)
IMAGE Shanna Diederichs.

End of Stratum 2 Level 1, 2-x2-m unit 1440N 201E.


5MT2032, Photo #20499, Field crew photo (2014)
IMAGE Shanna Diederichs.

Steve Copeland and Caitlin Sommer excavating a large dendro. Stratum 4 Level 2, 2-x2-m unit 1436N 210E.


5MT2032, Photo #20500, Other (2014)
IMAGE Shanna Diederichs.

Oblique view of burned adobe cast from roofing. Two beam impressions. Stratum 4 Level 2, 2-x2-m unit 1436N 210E.


5MT2032, Photo #20501, Plan view, excavation in progress (2014)
IMAGE Shanna Diederichs.

Example of roofing material. 10 cm above Surface 1, 2-x2-m unit 1440N 201E.


5MT2032, Photo #20502, Plan view, excavation in progress (2014)
IMAGE Shanna Diederichs.

PL 8, 10 cm above Surface 1, 2-x2-m unit 1440N 201E.


5MT2032, Photo #20503, Plan view, excavation in progress (2014)
IMAGE Caitlin Sommer.

Possible adobe wing wall with probable upright post. Stratum 6 Level 1, 2-x2-m unit 1436N 210E.


5MT2032, Photo #20504, Plan view, excavation in progress (2014)
IMAGE Caitlin Sommer.

Closeup of possible upright post near wing wall. Stratum 6 Level 1, 2-x2-m unit 1436N 210E.


5MT2032, Photo #20505, Plan view, excavation in progress (2014)
IMAGE Caitlin Sommer.

Closeup of possible wing wall. Stratum 6 Level 1, 2-x2-m unit 1436N 210E.