Assessment of Significance of the Henderson Site, 23By540, Prior To Pole Placement at the Terminous of the East Purdy 69Kv Transmission Line in Barry County, Missouri
Author(s): C. "Jeep" Helm; Burton L. Purrington
Year: 1980
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Assessment of Significance of the Henderson Site, 23By540, Prior To Pole Placement at the Terminous of the East Purdy 69Kv Transmission Line in Barry County, Missouri. C. "Jeep" Helm, Burton L. Purrington. 1980 ( tDAR id: 110978)
Keywords
Investigation Types
Site Evaluation / Testing
General
23BY540
•
Henderson Site
•
SWD-OAO
•
Transmission Line
Geographic Keywords
29009 (Fips Code)
•
Barry (County)
•
Missouri (State / Territory)
•
Missouri Ozarks Area
•
North America (Continent)
•
United States of America (Country)
Spatial Coverage
min long: -94.077; min lat: 36.499 ; max long: -93.574; max lat: 36.932 ;
Record Identifiers
NADB document id number(s): 2141251
NADB citation id number(s): 000000007865