Survey Level Study for Determination of Significance and Management Recommendations: 31st Street Pier, Brooklyn, New York, Brooklyn Reach 2, New York Harbor Collection and Removal of Drift Project
Author(s): Michael S. Raber
Year: 1985
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Survey Level Study for Determination of Significance and Management Recommendations: 31st Street Pier, Brooklyn, New York, Brooklyn Reach 2, New York Harbor Collection and Removal of Drift Project. Michael S. Raber. 1985 ( tDAR id: 118303)
Keywords
General
Architecture
•
Department of Docks & Ferries
•
Engineering Structure Overview / Synthesis-Proj
•
Management
•
Significance / Management
•
Statement For Management
•
Urban Studies
Geographic Keywords
36047 (Fips Code)
•
Brooklyn
•
Kings (County)
•
New York (State / Territory)
•
North America (Continent)
•
United States of America (Country)
Temporal Keywords
Historic
Temporal Coverage
Calendar Date: 1900 to 1924
Spatial Coverage
min long: -74.057; min lat: 40.551 ; max long: -73.833; max lat: 40.739 ;
Individual & Institutional Roles
Sponsor(s): NY Dist., US Army Corps of Engineers, NY, NY
Prepared By(s): Raber Assoc. , Cobalt, CT
Record Identifiers
NADB document id number(s): 15384
NADB citation id number(s): 000000089042
Notes
General Note: Submitted to: NY Dist., US Army Corps of Engineers, NY, NY
General Note: Contract number: DACW51-84-C-0004
General Note: Sent from: Raber Assoc., Cobalt, CT