Snohomish River Bridge Replacement, Sr 9, Snohomish, Washington

Author(s): Joan M. Robinson

Year: 1982

Summary

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.

If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.

Cite this Record

Snohomish River Bridge Replacement, Sr 9, Snohomish, Washington. Joan M. Robinson. 1982 ( tDAR id: 122713)

This Resource is Part of the Following Collections

Spatial Coverage

min long: -122.458; min lat: 47.775 ; max long: -120.906; max lat: 48.299 ;

Individual & Institutional Roles

Sponsor(s): State, County, and Local Government; Washington State Dept. of Transportation, Olympia, WA

Prepared By(s): Joan M. Robinson

Record Identifiers

NADB document id number(s): 1330599

NADB citation id number(s): 000000039175

Notes

General Note: Submitted to: Washington State Dept. of Transportation, Olympia, WA

General Note: Sent from: Joan M. Robinson