Woodstock-Alpharetta Proposed Transmission Line, Cherokee and Fulton Counties, Georgia
Author(s): James F. Bates
Year: 1983
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Woodstock-Alpharetta Proposed Transmission Line, Cherokee and Fulton Counties, Georgia. James F. Bates. 1983 ( tDAR id: 124596)
Keywords
Investigation Types
Archaeological Overview
General
Outline of Planning Requirements
•
Significance / Management
•
Site Settlement
Temporal Coverage
Calendar Date: 1800 to 1824
Spatial Coverage
min long: -84.659; min lat: 34.073 ; max long: -84.258; max lat: 34.413 ;
Individual & Institutional Roles
Sponsor(s): Federal Energy Regulatory Commission; Oglethorpe Power Company, Atlanta, GA
Prepared By(s): Claude Terry and Associates, Inc., Atlanta, GA
Record Identifiers
NADB document id number(s): 375873
NADB citation id number(s): 000000059350
Notes
General Note: Sent from: Claude Terry and Associates, Inc., Atlanta, GA
General Note: Submitted to: Oglethorpe Power Company, Atlanta, GA
General Note: Contract number: HPS 84-01-16-001