Phase I Archaeological Reconnaissance for the Proposed Medium Intensity Approach Lighting System at Groton-New London Airport, Groton, Connecticut

Author(s): Louis Berger & Associates, Inc.

Year: 1986

Summary

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.

If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.

Cite this Record

Phase I Archaeological Reconnaissance for the Proposed Medium Intensity Approach Lighting System at Groton-New London Airport, Groton, Connecticut. Louis Berger & Associates, Inc.. 1986 ( tDAR id: 139229)

This Resource is Part of the Following Collections

Spatial Coverage

min long: -72.467; min lat: 41.215 ; max long: -71.788; max lat: 41.714 ;

Individual & Institutional Roles

Sponsor(s): Urbitran Associates, Inc., NY, NY

Prepared By(s): Louis Berger & Associates, Inc. , E. Orange, NJ

Record Identifiers

NADB document id number(s): 113

NADB citation id number(s): 000000078580

Notes

General Note: Sent from: Louis Berger & Associates, Inc., E. Orange, NJ

General Note: Submitted to: Urbitran Associates, Inc., NY, NY