Jumbo Mountain Trail Construction, 1 / 4 Mile Stock Trail Requires Realignment Resulting From Mud Slide

Author(s): Alan R. Tohill

Year: 1986

Summary

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.

If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.

Cite this Record

Jumbo Mountain Trail Construction, 1 / 4 Mile Stock Trail Requires Realignment Resulting From Mud Slide. Alan R. Tohill. 1986 ( tDAR id: 140140)

This Resource is Part of the Following Collections

Spatial Coverage

min long: -108.379; min lat: 38.667 ; max long: -107.501; max lat: 39.218 ;

Record Identifiers

NADB document id number(s): 605821

NADB citation id number(s): 000000096217

Notes

General Note: Submitted to: BLM, Uncompahgre Basin Resource Area, Montrose, Co

General Note: Sent from: BLM, Uncompahgre Basin Resource Area, Montrose, CO