Amendment To Cultural Resource Assessment for The: Bolton Falls Project Green Mountain Power Corporation Phase Ib and II

Author(s): Wesley R. Stinson; John G. Albers

Year: 1980

Summary

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.

If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.

Cite this Record

Amendment To Cultural Resource Assessment for The: Bolton Falls Project Green Mountain Power Corporation Phase Ib and II. Wesley R. Stinson, John G. Albers. 1980 ( tDAR id: 144518)

This Resource is Part of the Following Collections

Spatial Coverage

min long: -72.952; min lat: 44.013 ; max long: -72.217; max lat: 44.506 ;

Individual & Institutional Roles

Sponsor(s): Green Mountain Power Corp.

Prepared By(s): Commonwealth Associates, Inc.

Record Identifiers

NADB document id number(s): 12827

NADB citation id number(s): 000000087439

Notes

General Note: Sent from: Commonwealth Associates, Inc.

General Note: Submitted to: Green Mountain Power Corp.