Rocky Mountain Project Cultural Resource Management Effects Mitigation and Resource Management Plan and Amendment 1 Rocky Mountain Pumped Storage Generating Station, Floyd County, Georgia
Author(s): J. J. Shive
Year: 1981
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Rocky Mountain Project Cultural Resource Management Effects Mitigation and Resource Management Plan and Amendment 1 Rocky Mountain Pumped Storage Generating Station, Floyd County, Georgia. J. J. Shive. 1981 ( tDAR id: 148199)
Keywords
General
Architectural Recordings
•
Camping Area
•
Cultural Resource
•
Cultural Resources Management Plan
•
Hydroelectric Generating Station
•
Management
•
Mitigation
Geographic Keywords
13115 (Fips Code)
•
Floyd (County)
•
Georgia (State / Territory)
•
North America (Continent)
•
Rome
•
United States of America (Country)
Spatial Coverage
min long: -85.462; min lat: 34.079 ; max long: -85.005; max lat: 34.587 ;
Individual & Institutional Roles
Sponsor(s): Federal Energy Regulatory Commission
Prepared By(s): Georgia Power Company
Record Identifiers
NADB document id number(s): 550573
NADB citation id number(s): 000000068058
Notes
General Note: Sent from: Georgia Power Company
General Note: Contract number: 2725
General Note: Submitted to: Federal Energy Regulatory Commission